Commit Graph
47 Commits
Author SHA1 Message Date
bchanot 29073a956b docs(docs): U2 boards and A1-A15 validated by owner, three adjustments, BDR-122 2026-11-17 15:34:46 +01:00
bchanot 272a7b54e4 docs(docs): U2 boards re-check fixes, A15, notes aligned, owner gate 2026-11-17 13:26:33 +01:00
bchanot 8bdb23ab0f docs(docs): U2 boards review fixes, arbitrations A11-A14, controls recorded 2026-11-17 13:13:02 +01:00
bchanot bc19481b93 docs(docs): V1-2.6 U2 boards 02-06, 13, 31-33, review and arbitrations 2026-11-17 12:54:12 +01:00
bchanot e79118cecf docs(docs): R4 final fix wave as built, results and trial step
Busy look, stopped-engine tone, focus when no retry is left, board 30
deviation fixed, cleanup name check, write-budget row as R4's own, row C
built by R4 pending the owner's validation, exact results of the wave.
2026-11-17 01:07:11 +01:00
bchanot e1cdd9d25c docs(docs): R4 catalogue card integrity warning as built 2026-11-17 00:31:52 +01:00
bchanot c25a994c0e docs(docs): R3 phone filters, trial step 4.15, verifier gap closed 2026-11-16 20:33:15 +01:00
bchanot bcdacbbb9a docs(app): R3 gate results, fix wave run, deploy order, trial steps
- CHANGELOG: the six shell failures split into the four Target crashed
  of BLK-015 and the two A0 lookup timeouts (counted as BLK-015, not A/B
  proven); pgTAP 014 / 021 not proven by a run without M9; the intro
  names the R3 entry's branch
- owner trial 4.15: steps strictly in order (step 5 shows what two
  sheets prove, the move back to the top is step 9's last action), how
  to open the working copy, the trimmed text, no Claude sentence, the
  re-save sentence removed
- deploy order (database first, then the application) and its
  fail-closed consequence in the SQL checkpoint and SUPABASE.md
- design review, code review and security gate results, the fix wave
  run, the owner decisions left open; verifier, check:all and the owner
  trial still pending
- TODO: fix wave line, three follow-ups
2026-11-16 18:11:12 +01:00
bchanot a86020d6e3 docs(app): R3 sheet list documents as built, M9 applied
V1-2-6_U1_CORRECTIONS §R3 as built (A7 split superseded by D2, exact
results, deviations), the SQL checkpoint applied with corrections F2 to
F4, the owner's answers and the date limits F7, M9 in §12.3, db:sandbox
migrate, the sheet list spec and its named failures, class C rows, the
design deviations, CLAUDE.md and CHANGELOG. Gates pending.
2026-11-16 17:47:49 +01:00
bchanot 8c420d4b53 docs(docs): record the R2 follow-up of 2026-11-15 2026-11-15 16:52:12 +01:00
bchanot 685a96741b docs(docs): close R2 after the owner trial, record U2 orientation 2026-11-14 15:18:06 +01:00
bchanot 89acdfd4fd docs(docs): record the R2 finish and its trial steps 2026-11-13 22:41:01 +01:00
bchanot 00936c8c54 docs(app): R1 follow-up, selection tag out of the visual flow 2026-11-12 15:21:30 +01:00
bchanot 927537b343 fix(editor): keep the drawing still when the selection changes
The « Sélection : … » tag above the drawing mounted on select and
unmounted on deselect, moving the canvas. It is now sr-only text,
not live, in both twins; board 04 deviation recorded (owner 2026-11-12).
2026-11-12 15:16:34 +01:00
bchanot 9bfc5a1567 docs(docs): R0 last graphic corrections and final graphic validation 2026-11-09 17:42:43 +01:00
bchanot 9e676bb811 docs(docs): R0 owner graphic corrections, arbitrations settled, impeccable observations 2026-11-09 17:01:26 +01:00
bchanot 84aba41b7d docs(docs): R0 owner decisions, A1-A15 table, R3 SQL checkpoint proposal 2026-11-09 16:27:46 +01:00
bchanot 3d64146164 docs(docs): R0 boards, U1 corrections plan and trial stack plan
Owner brief of 2026-11-09 after the first U1 trial. Boards 23-30 (proposal), lots R0-R4 with arbitrations A1-A15, persistent trial stack plan. No code.
2026-11-09 16:13:04 +01:00
bchanot 1ed5c96e1b docs(docs): U2b F5, F9-F21 ratified with F3, F8, F11-F14, F22 precisions
Owner brief « Ratification finale U1 et autorisation conditionnelle
d'implémentation » (BDR-105): study §6 tests, §7 table, 7.2, 7.3,
UX plan U2b entry, REVUE and decisions pointer. No implementation.
2026-11-06 17:12:30 +01:00
bchanot 13dee0908b docs(docs): U2b decisions F2-F22 recorded, U1 authorisation checkpoint
Owner arbitrations: F2 leaves, F3 fields, F4 model A, F8, F22 in the study
with their tests. U1 checkpoint page: 18 choices, exact AC amendments,
audits traced, sandbox reset scope, criteria per lot; no implicit deletion.
2026-11-06 15:53:43 +01:00
bchanot 604f502b44 docs(docs): U2b principle, decisions F1-F22, F2/F3/F4 detail, U2b sub-step
Owner principle validation recorded: U2b after U2; full decision table with
alternatives, consequences and state; F2 groups, F3 field list and F4 view
semantics computed from the equine draft; boards shown with their decisions.
2026-11-06 14:56:49 +01:00
bchanot 567da677d7 docs(docs): complement after verifier CONFORME, trigger name per the core
Detail trigger shows its view's name as the core does; F7 cites the
current Catégorie labels; review record and TODO updated.
2026-11-06 13:28:48 +01:00
bchanot 00aaccfc79 docs(docs): complement boards compute the last names, decisions F17-F21
Verifier round 2: view chip and grasset names computed from the draft;
partial clears, out-of-filter count, zone picker order, dashed sibling
and result presentation listed as owner decisions.
2026-11-06 13:22:54 +01:00
bchanot 212126c6ce docs(docs): V1-2.6 annotations-findings complement, boards 17-22, study
Owner brief: bidirectional navigation between annotations and findings.
Relations audit (one finding_zone_id link, no new association), six
boards from the equine draft data, placement U2b, risks, tests, owner
decisions F1-F16. Design only; U1 plan untouched.
2026-11-06 13:15:15 +01:00
bchanot d9e3e34aff docs(docs): V1-2.6 UX U0, contract amendments, O22 checks, level-1 notes 2026-11-06 11:06:10 +01:00
bchanot d11cb5a44b docs(docs): V1-2.6 maquettes, delta conformance result 2026-11-05 16:14:42 +01:00
bchanot b5058b3417 docs(docs): V1-2.6 maquettes, header undo visible on Constats, review fixes 2026-11-05 16:09:52 +01:00
bchanot 7bc3d6544e docs(docs): V1-2.6 maquettes final corrections after the external review 2026-11-05 16:02:35 +01:00
bchanot d21ffcc5dc docs(docs): V1-2.6 maquettes arbitrations, technical study, conformance result 2026-11-05 15:35:39 +01:00
bchanot 46ea996a61 docs(docs): V1-2.6 graphic editor maquettes and core feasibility audit 2026-11-05 15:16:28 +01:00
bchanot 071b58a5f6 docs(docs): V1-2.6 state, AAL2 residual as a production prerequisite 2026-11-04 15:59:20 +01:00
bchanot dcb1a94ee4 docs(supabase): V1-2.5 checkpoint decisions, TOTP reuse measured, lost-factor review
IDENTITY 4.1 asserted reuse span (step N and N+1), 4.2 lost authenticator paths and gaps, production prerequisite; V1-2 contract 12.3, 13, 17.10, 17.11; design README accepted deviations; REVUE L15 and object_conflict EN; M7 header.
2026-11-02 22:57:22 +01:00
bchanot 3d2b5a5f1c docs(docs): V1-2.5 administration, MFA, catalogue documented
CLAUDE.md overview and folder map, IDENTITY §1 and §4, BROWSER_TESTS shell specs, V1-2 contract §16.6 state and §5.7.3-§5.7.4 pointers, design README owning steps with two deviations.
2026-11-02 17:48:50 +01:00
bchanot 567f27e37d docs(docs): record the V1-2.4 owner graphic approval
V1-2.4 GRAPHICAL APPROVED: twelve boards and the « Accès non autorisé » page, unchanged. Contract §16.5 state, §17.9 (object_conflict FR, L14, L20 EN, L32 EN, messages checked at integration, L15 second sentence open), §3 and §11.3 pointers; REVUE.md labels and status; design README validated with owning steps.
2026-11-02 15:38:42 +01:00
bchanot 27e5727cca docs(docs): V1-2.4 owner label arbitrations and board 05 framing
BDR-095 references in the contract (§3 L11, §14.2, §16.8 review lists, §17.8). Board 05 shows the whole horse at 768 px; 05, 06, 07, 09, 10, 12 carry the labels ratified on 2026-11-02; REVUE.md lists ratified and open labels. Still a proposal, no global graphic approval.
2026-11-02 14:52:36 +01:00
bchanot f9fc13c110 docs(docs): V1-2.4 REVUE.md records the third conformance check 2026-11-02 14:00:54 +01:00
bchanot 9adbd3ac34 docs(docs): V1-2.4 final graphic corrections and access-denied board
Owner brief « dernières corrections graphiques »: sheet-name search only (01), whole horse at opening on a phone (03), vertex wording (04), 1 024 px instead of a device (05), distinct failed/unavailable titles (06), board 12 rows. Complementary « Accès non autorisé » board outside the twelve. Still a proposal.
2026-11-02 13:51:19 +01:00
bchanot 7979506f35 docs(docs): V1-2.4 catalogue access UX and verdict_refused divergence
Records BDR-094 in the V1-2 contract (§5.3 hidden entry and « Accès non autorisé » page, §11.1 reviewer-only Administration content, §6.5 no operator notification, §17.8) and in REVUE.md. Boards unchanged, still a proposal.
2026-11-02 12:53:28 +01:00
bchanot 98e8403f8b docs(docs): V1-2.4 maquettes G1/G2 corrections and review dossier
Board 06 drops a warning the core cannot raise, board 12 leaves « Mark as reviewed » to arbitrate and states the real fingerprint and verdict_refused behaviour. Adds the contact sheet and REVUE.md. Still a proposal, no graphic approval.
2026-11-02 12:44:16 +01:00
bchanot c434e0e944 docs(docs): V1-2.4 maquettes verifier notes (working copy, vertices, change wording) 2026-11-02 00:51:49 +01:00
bchanot 108604acf4 docs(docs): V1-2.4 maquettes revised after the design review 2026-11-02 00:43:16 +01:00
bchanot f00d8b4e4c docs(docs): V1-2.4 maquettes proposal, verification worker risk register
docs/design/v1-2-4: twelve functional mockups on the existing identity
(catalogue, editor, narrow read-only, verification states, review, admin
navigation, FR/EN labels), not validated. V1-2 contract §13.1: accepted risks
VR-1 (CPU contention, MEDIUM) to VR-5 with their re-examination condition.
2026-11-02 00:11:04 +01:00
bchanot e215e9b2cb docs(docs): V1-1.6 as built, D11 drawer only, closure inventory, DEV steps
Contract §11.8 and §15; D11 and U3 decided, D12 open; SUPABASE.md §3.3 gains
the rehearsed restore check and the owner's browser acceptance on DEV; browser,
test and frontend docs, design README, CLAUDE.md map.
2026-10-26 17:24:19 +01:00
bchanot ae0bd3f8d8 docs(docs): V1-1.5 clients screens as built, owner choices, tests
Contract §11.7 (U1, U2, animals read-only, first-animal section deferred;
access layer, workspace state, routes, form, page, leave guard, focus,
deviations, counts), FRONTEND_ARCHITECTURE note, design README owners row,
TEST_STRATEGY, SUPABASE.md access layer and DEV note, CLAUDE.md map.
2026-10-26 02:01:55 +01:00
bchanot ac60b24267 docs(docs): realign active docs on develop for P0
Roadmap section and step statuses in the plan, D-R9 Rust services in
place of Edge Functions and a Node worker, platform roles per BDR-026,
equine sheet draft-only, curation-only authoring until Step 17,
OPEN_QUESTIONS statuses and conflict resolutions, dated snapshot
notices on the Step 0 documents.
2026-10-25 17:12:37 +01:00
bchanot 62eb4e5d82 docs(docs): Step 8 / R1 — files foundation, worker loop, avatar: CLAUDE, DEPLOY (.env.worker, CSP), SUPABASE, RUST, TEST_STRATEGY, WORKSPACE, IDENTITY §5, design README, plan as-built note, CHANGELOG; R1 plan and verifier contract 2026-10-13 19:39:52 +02:00
bchanot 3cf74fd255 docs(docs): validated Step 7 mockups under docs/design (reference README with deltas and owning steps); chore(memory): BDR-042, journal, TODO 7.10 follow-ups — Step 7 validated 2026-10-12 00:54:03 +02:00