Commit Graph
16 Commits
Author SHA1 Message Date
bchanot dcb1a94ee4 docs(supabase): V1-2.5 checkpoint decisions, TOTP reuse measured, lost-factor review
IDENTITY 4.1 asserted reuse span (step N and N+1), 4.2 lost authenticator paths and gaps, production prerequisite; V1-2 contract 12.3, 13, 17.10, 17.11; design README accepted deviations; REVUE L15 and object_conflict EN; M7 header.
2026-11-02 22:57:22 +01:00
bchanot 3d2b5a5f1c docs(docs): V1-2.5 administration, MFA, catalogue documented
CLAUDE.md overview and folder map, IDENTITY §1 and §4, BROWSER_TESTS shell specs, V1-2 contract §16.6 state and §5.7.3-§5.7.4 pointers, design README owning steps with two deviations.
2026-11-02 17:48:50 +01:00
bchanot 567f27e37d docs(docs): record the V1-2.4 owner graphic approval
V1-2.4 GRAPHICAL APPROVED: twelve boards and the « Accès non autorisé » page, unchanged. Contract §16.5 state, §17.9 (object_conflict FR, L14, L20 EN, L32 EN, messages checked at integration, L15 second sentence open), §3 and §11.3 pointers; REVUE.md labels and status; design README validated with owning steps.
2026-11-02 15:38:42 +01:00
bchanot 27e5727cca docs(docs): V1-2.4 owner label arbitrations and board 05 framing
BDR-095 references in the contract (§3 L11, §14.2, §16.8 review lists, §17.8). Board 05 shows the whole horse at 768 px; 05, 06, 07, 09, 10, 12 carry the labels ratified on 2026-11-02; REVUE.md lists ratified and open labels. Still a proposal, no global graphic approval.
2026-11-02 14:52:36 +01:00
bchanot f9fc13c110 docs(docs): V1-2.4 REVUE.md records the third conformance check 2026-11-02 14:00:54 +01:00
bchanot 9adbd3ac34 docs(docs): V1-2.4 final graphic corrections and access-denied board
Owner brief « dernières corrections graphiques »: sheet-name search only (01), whole horse at opening on a phone (03), vertex wording (04), 1 024 px instead of a device (05), distinct failed/unavailable titles (06), board 12 rows. Complementary « Accès non autorisé » board outside the twelve. Still a proposal.
2026-11-02 13:51:19 +01:00
bchanot 7979506f35 docs(docs): V1-2.4 catalogue access UX and verdict_refused divergence
Records BDR-094 in the V1-2 contract (§5.3 hidden entry and « Accès non autorisé » page, §11.1 reviewer-only Administration content, §6.5 no operator notification, §17.8) and in REVUE.md. Boards unchanged, still a proposal.
2026-11-02 12:53:28 +01:00
bchanot 98e8403f8b docs(docs): V1-2.4 maquettes G1/G2 corrections and review dossier
Board 06 drops a warning the core cannot raise, board 12 leaves « Mark as reviewed » to arbitrate and states the real fingerprint and verdict_refused behaviour. Adds the contact sheet and REVUE.md. Still a proposal, no graphic approval.
2026-11-02 12:44:16 +01:00
bchanot c434e0e944 docs(docs): V1-2.4 maquettes verifier notes (working copy, vertices, change wording) 2026-11-02 00:51:49 +01:00
bchanot 108604acf4 docs(docs): V1-2.4 maquettes revised after the design review 2026-11-02 00:43:16 +01:00
bchanot f00d8b4e4c docs(docs): V1-2.4 maquettes proposal, verification worker risk register
docs/design/v1-2-4: twelve functional mockups on the existing identity
(catalogue, editor, narrow read-only, verification states, review, admin
navigation, FR/EN labels), not validated. V1-2 contract §13.1: accepted risks
VR-1 (CPU contention, MEDIUM) to VR-5 with their re-examination condition.
2026-11-02 00:11:04 +01:00
bchanot e215e9b2cb docs(docs): V1-1.6 as built, D11 drawer only, closure inventory, DEV steps
Contract §11.8 and §15; D11 and U3 decided, D12 open; SUPABASE.md §3.3 gains
the rehearsed restore check and the owner's browser acceptance on DEV; browser,
test and frontend docs, design README, CLAUDE.md map.
2026-10-26 17:24:19 +01:00
bchanot ae0bd3f8d8 docs(docs): V1-1.5 clients screens as built, owner choices, tests
Contract §11.7 (U1, U2, animals read-only, first-animal section deferred;
access layer, workspace state, routes, form, page, leave guard, focus,
deviations, counts), FRONTEND_ARCHITECTURE note, design README owners row,
TEST_STRATEGY, SUPABASE.md access layer and DEV note, CLAUDE.md map.
2026-10-26 02:01:55 +01:00
bchanot ac60b24267 docs(docs): realign active docs on develop for P0
Roadmap section and step statuses in the plan, D-R9 Rust services in
place of Edge Functions and a Node worker, platform roles per BDR-026,
equine sheet draft-only, curation-only authoring until Step 17,
OPEN_QUESTIONS statuses and conflict resolutions, dated snapshot
notices on the Step 0 documents.
2026-10-25 17:12:37 +01:00
bchanot 62eb4e5d82 docs(docs): Step 8 / R1 — files foundation, worker loop, avatar: CLAUDE, DEPLOY (.env.worker, CSP), SUPABASE, RUST, TEST_STRATEGY, WORKSPACE, IDENTITY §5, design README, plan as-built note, CHANGELOG; R1 plan and verifier contract 2026-10-13 19:39:52 +02:00
bchanot 3cf74fd255 docs(docs): validated Step 7 mockups under docs/design (reference README with deltas and owning steps); chore(memory): BDR-042, journal, TODO 7.10 follow-ups — Step 7 validated 2026-10-12 00:54:03 +02:00