Commit Graph
6 Commits
Author SHA1 Message Date
bchanot f00d8b4e4c docs(docs): V1-2.4 maquettes proposal, verification worker risk register
docs/design/v1-2-4: twelve functional mockups on the existing identity
(catalogue, editor, narrow read-only, verification states, review, admin
navigation, FR/EN labels), not validated. V1-2 contract §13.1: accepted risks
VR-1 (CPU contention, MEDIUM) to VR-5 with their re-examination condition.
2026-11-02 00:11:04 +01:00
bchanot e215e9b2cb docs(docs): V1-1.6 as built, D11 drawer only, closure inventory, DEV steps
Contract §11.8 and §15; D11 and U3 decided, D12 open; SUPABASE.md §3.3 gains
the rehearsed restore check and the owner's browser acceptance on DEV; browser,
test and frontend docs, design README, CLAUDE.md map.
2026-10-26 17:24:19 +01:00
bchanot ae0bd3f8d8 docs(docs): V1-1.5 clients screens as built, owner choices, tests
Contract §11.7 (U1, U2, animals read-only, first-animal section deferred;
access layer, workspace state, routes, form, page, leave guard, focus,
deviations, counts), FRONTEND_ARCHITECTURE note, design README owners row,
TEST_STRATEGY, SUPABASE.md access layer and DEV note, CLAUDE.md map.
2026-10-26 02:01:55 +01:00
bchanot ac60b24267 docs(docs): realign active docs on develop for P0
Roadmap section and step statuses in the plan, D-R9 Rust services in
place of Edge Functions and a Node worker, platform roles per BDR-026,
equine sheet draft-only, curation-only authoring until Step 17,
OPEN_QUESTIONS statuses and conflict resolutions, dated snapshot
notices on the Step 0 documents.
2026-10-25 17:12:37 +01:00
bchanot 62eb4e5d82 docs(docs): Step 8 / R1 — files foundation, worker loop, avatar: CLAUDE, DEPLOY (.env.worker, CSP), SUPABASE, RUST, TEST_STRATEGY, WORKSPACE, IDENTITY §5, design README, plan as-built note, CHANGELOG; R1 plan and verifier contract 2026-10-13 19:39:52 +02:00
bchanot 3cf74fd255 docs(docs): validated Step 7 mockups under docs/design (reference README with deltas and owning steps); chore(memory): BDR-042, journal, TODO 7.10 follow-ups — Step 7 validated 2026-10-12 00:54:03 +02:00