Preflight of DEV recorded; backup adds row fingerprints and Storage bytes; restore check runs on the isolated stack; post-migration SQL, test effects, failure and restore effects; browser acceptance aligned on the owner brief.
Contract §11.8 and §15; D11 and U3 decided, D12 open; SUPABASE.md §3.3 gains
the rehearsed restore check and the owner's browser acceptance on DEV; browser,
test and frontend docs, design README, CLAUDE.md map.
Contract §8.3 (differences, relation states, caps, lock order across M2 and
M3, concurrency results, migration states, mutations, residuals), helpers
and derived values; SUPABASE.md §3.3 procedure from DEV's current state to
M3 (not run) and §3.5; TEST_STRATEGY, plan note, backend table, CLAUDE.md.
Contract §11.6: D13 final behaviour of the native modal dialog, D14 as built against the isolated stack, the three mobile navigation sources and their consequences for Clients and Animaux. BROWSER_TESTS.md: suites, prerequisites, guarantees, failures, limits. TEST_STRATEGY, SUPABASE §5.1, FRONTEND snapshot note, CLAUDE.md.
Contract §8.2 (as built, divergent replay, fold, measured search, residual hint), §9 helpers and lock order, §9.4 request_conflict, §10 UTC budget windows. SUPABASE.md §3.4 and the DEV procedure for M1 and M2 pending together (rehearsed). TEST_STRATEGY counts.
Contract: N4 voiding instead of deletion, N5 date constraints, N6 write budget per workspace under a lock, N7 effective-privilege wording and residual admin paths, N9 audit metadata limited to ids; M1 as-built notes and isolated-stack results (§8.1). SUPABASE.md §3.3 with the owner procedure to apply M1 on DEV without reset; backend architecture, test strategy, plan and CLAUDE.md lines.
Owner ratified the V1-1 business decisions. The contract now records them
as approved, adds the nomenclature, the proposed SQL schema, RLS, RPCs,
technical limits, journeys and test plan, and lists the choices left for
the owner. OPEN_QUESTIONS, plan, DOMAIN_MAP, README and CLAUDE.md follow.
Functional contract for roadmap item V1-1 with the owner's orientations
of 2026-10-25 recorded as proposals awaiting ratification (D1-D9, D16,
C4-C6), their SQL and permission impact, the sub-choices they leave and
the decisions still open. No migration, table, RPC or component.