Commit Graph
10 Commits
Author SHA1 Message Date
bchanot da04c79d13 docs(docs): U2 plan rev 5, owner decisions 2026-11-19 19:44:57 +01:00
bchanot 0aa0f6bc62 docs(docs): rev 4 gate figures and the amended held-reason criterion 2026-11-19 15:44:25 +01:00
bchanot 816d0f4f9a docs(docs): U2 rev 4, owner corrections before the trial 2026-11-19 00:45:08 +01:00
bchanot 4e2bdb5ebb docs(docs): U2 final gate results and measures on 15b23f8
UX_TESTS: gates at 15b23f8 (check:all passed; shell suite 311 passed, 14 failed, red; test 105 passed; test-db FAIL 014/021 as before U2), measures rerun, keyboard map row (Backspace only while tracing). Plan Tasks 8 and 10 and OWNER_TRIAL Mesures carry the new figures.
2026-11-18 14:54:24 +01:00
bchanot c6b8c7e48a docs(docs): U2 owner trial section and gate figures
OWNER_TRIAL §4.17: db:trial preparation, mouse and tablet steps, visible choices to judge, invented strings, known limits, measures. Plan Task 10 Step 3 and UX_TESTS performance row: commit latency figures. CLAUDE.md cites the two hand-run measure specs.
2026-11-18 12:20:49 +01:00
bchanot 0ca1f20452 docs(docs): U2 plan records the loupe drag measure 2026-11-18 11:18:03 +01:00
bchanot 56c75b12ef docs(docs): U2 plan rev 3 with owner answers, implementation contract, BDR-123 2026-11-17 16:24:26 +01:00
bchanot 8c5a8871e5 docs(docs): U2 plan rev 2 final pass, D2 added 2026-11-17 16:16:07 +01:00
bchanot 31d0c415ec docs(docs): U2 technical plan rev 2 after three challenges, D1 open 2026-11-17 16:10:55 +01:00
bchanot 6de5e56e33 docs(docs): U2 technical plan rev 1 2026-11-17 15:46:08 +01:00