5 Commits
Author SHA1 Message Date
bchanot e215e9b2cb docs(docs): V1-1.6 as built, D11 drawer only, closure inventory, DEV steps
Contract §11.8 and §15; D11 and U3 decided, D12 open; SUPABASE.md §3.3 gains
the rehearsed restore check and the owner's browser acceptance on DEV; browser,
test and frontend docs, design README, CLAUDE.md map.
2026-10-26 17:24:19 +01:00
bchanot ae0bd3f8d8 docs(docs): V1-1.5 clients screens as built, owner choices, tests
Contract §11.7 (U1, U2, animals read-only, first-animal section deferred;
access layer, workspace state, routes, form, page, leave guard, focus,
deviations, counts), FRONTEND_ARCHITECTURE note, design README owners row,
TEST_STRATEGY, SUPABASE.md access layer and DEV note, CLAUDE.md map.
2026-10-26 02:01:55 +01:00
bchanot 9cd33f1217 docs(docs): V1-1.3 dialogs, browser tests and the D11 comparison
Contract §11.6: D13 final behaviour of the native modal dialog, D14 as built against the isolated stack, the three mobile navigation sources and their consequences for Clients and Animaux. BROWSER_TESTS.md: suites, prerequisites, guarantees, failures, limits. TEST_STRATEGY, SUPABASE §5.1, FRONTEND snapshot note, CLAUDE.md.
2026-10-25 23:37:00 +01:00
bchanot ac60b24267 docs(docs): realign active docs on develop for P0
Roadmap section and step statuses in the plan, D-R9 Rust services in
place of Edge Functions and a Node worker, platform roles per BDR-026,
equine sheet draft-only, curation-only authoring until Step 17,
OPEN_QUESTIONS statuses and conflict resolutions, dated snapshot
notices on the Step 0 documents.
2026-10-25 17:12:37 +01:00
bchanot b0cce2cd8c docs(docs): add SaaS implementation plan and architecture docs (step 0)
Eight documents under docs/development/ confronting the approved business
architecture with the audited code: 27-step plan, repository migration map,
domain map, frontend/backend architecture, migration and test strategy,
open questions. Reference document placed at the repository root.
2026-10-08 21:41:39 +02:00