chore(memory): journal U2 plan rev 2
This commit is contained in:
1 parent
8c5a8871e5
commit
838ae42a51
1 file changed
+1
@@ -577,3 +577,4 @@ R5.4: `draft/{labels,changelog,review_report,drawing,overlay,app_review,svg_comp
|
||||
- R4 built 2026-11-17 (f061111..8224eda): card integrity line A10, caps own line (D1), view line (D2), retry/focus R-3; spec on sandbox 6p, cleanup archive own ids; check:all exit 0 at 2c9d837 (app 1780); verifier 16/16 MET, 2 out-of-scope files to owner. STOP owner trial §4.16 on db:sandbox trial.
|
||||
- R4 CLOSED 2026-11-17: owner manual trial db:sandbox §4.16 pass, archive (D4) + Card.tsx/records.ts accepted, BDR-121. check:all 2c9d837 exit 0, spec 6/0/0/0 x4. BLK-015, RR-13, anomaly A open. Next U2 design (boards 02-06, 13), no code.
|
||||
- U2 design 2026-11-17: boards 02-06,13,31-33 in docs/design/v1-2-6-u2 (bc19481, 8bdb23a, pass 3), 15 arbitrations, A1-A3 deviate from orientation 14/11 (first click selects only; dialog over right column; overview kept). Design review 5 must-fix fixed; verifier ECARTS(4)->ECARTS(1)->fixed. STOP owner visual validation.
|
||||
- U2 design validated (BDR-122); U2 tech plan rev 2 (8c5a887) after 3 challengers + final pass; D1 RepairDialog coords until U5, D2 « + » on short segments; waits owner, no code.
|
||||
Reference in new issue
Block a user