chore(memory): BDR-096 V1-2.4 graphic approval, TODO, journal

This commit is contained in:
bchanot committed 2026-11-02 15:38:53 +01:00
1 parent 567f27e37d
commit 410025715c
3 files changed
+19 -2

No files matched your search

+5 -2
View File
@@ -653,7 +653,8 @@ Order (BDR-071): P0 docs + decisions → V1-1 clients and animals → V1-2 sheet
- [x] C4 sandbox seeded accounts get a per-session secret (no DEV seed password dependency)
- [x] C5 four historical test reductions recorded in `.claude/audits/2026-11-01-v1-2-floor-reductions.md`: none hides a security coverage (O22 mirror removal and client gate, server gate tested; one false positive)
- [x] C6 gates on 3c141c9 (check:all, test-db 1898, test 87, verify-e2e 10/10, e2e:avatar 5/5, e2e:shell 86, DEV untouched); targeted review PASS, 3 LOWs fixed, MEDIUM CPU-contention timeout + 3 LOWs open for owner; verifier ECARTS(1) (STORAGE §6 DEV pairing) → fixed 093083d, delta verifier CONFORME · C7 V1-2.4 scope `.claude/tasks/contracts/2026-11-01-v1-2-4-wireframes-scope.md`
- [ ] V1-2.4 wireframes (editor, review, admin entry) · V1-2.5 catalogue, admin space, rights, species, MFA · V1-2.6 editor level 1 · V1-2.7 preview, review, publication UI · V1-2.8 equine working copy and review preparation · V1-2.9 FR/EN acceptance and closure (owner checkpoints V1-2.3, V1-2.4, V1-2.6, V1-2.7, V1-2.8, V1-2.9 + each DEV operation of contract §16.11)
- [x] V1-2.4 wireframes (editor, review, admin entry): GRAPHICAL APPROVED 2026-11-02 (BDR-096; detail under S below)
- [ ] V1-2.5 catalogue, admin space, rights, species, MFA · V1-2.6 editor level 1 · V1-2.7 preview, review, publication UI · V1-2.8 equine working copy and review preparation · V1-2.9 FR/EN acceptance and closure (owner checkpoints V1-2.3, V1-2.4, V1-2.6, V1-2.7, V1-2.8, V1-2.9 + each DEV operation of contract §16.11)
## Release readiness track (owner 2026-10-25, distinct from the functional roadmap; nothing here authorises a release or exposure)
Inventory: `.claude/audits/2026-10-25-functional-inventory.md`. Each item: treat or qualify before any release or public exposure; not fixed now unless an active critical flaw is shown.
@@ -803,7 +804,8 @@ Apply when implementing B-phase:
- [ ] still vulnerable, owner decision needed: develop `pnpm e2e:avatar` (scripts/avatar-e2e.sh: DEV keys, worker on DEV, writes, purge expedite); main checkout (feature/v1-1-clients-animals) and worktree old-958228a hold both old scripts on disk; main and release/0.2.0 hold neither. Agents never run them.
- [ ] V1-2.4 maquettes: design review (4 MUST-FIX, 10 SHOULD) applied, boards re-rendered; sheet-assets V1-2 security PASS, LOWs open: one sandbox e2e at a time (shared gateway name and port), PGPASSWORD reaches the sheet-assets build, issuer claim not signature, gateway left after SIGKILL; verifier ECARTS(2) on a15c35c (G1 phantom warning board 06, G2 « Mark as reviewed » shown ratified) → owner-authorised text fixes + fingerprint / verdict_refused messages, only 06 and 12 re-rendered, contact sheet + `docs/design/v1-2-4/REVUE.md` (98e8403); fresh verifier CONFORME; graphic checkpoint: owner visual validation of the 12 boards and 31 FR/EN labels pending
- [x] UX decisions 2-11 ratified, item 3 settled (hidden entry, « Accès non autorisé », signed out → login), reviewer-only keeps limited « Administration », §6.5 alert divergence recorded: BDR-094, contract §5.3, §6.5, §11.1, §17.8, REVUE.md (L32 « Accès non autorisé » EN to arbitrate)
- [ ] owner: global visual validation of the 12 boards + complement; open labels L15 2nd sentence, L20 EN, L32 EN/explanation, object_conflict, 16 other code messages
- [x] owner: global visual validation of the 12 boards + complement (brief « Validation propriétaire V1-2.4 », 2026-11-02, on 74aa8f6): V1-2.4 GRAPHICAL APPROVED, BDR-096, contract §16.5 + §17.9, maquettes contract, REVUE.md, design README; L20 EN « Fix the draft » / « Edit the draft », L32 EN « Access denied » (explanation + link as decided), object_conflict FR ratified; L14 confirmed; no board regenerated
- [ ] still open after the approval, none blocking: L15 2nd sentence (before V1-2.6 narrow-screen mode), object_conflict EN + 16 other code messages (checked at integration), L30 refusal messages (with their screens: rights.* + mfa_required V1-2.5, verdict/publish/review V1-2.7)
- [ ] final graphic corrections (brief « V1-2.4 : dernières corrections graphiques », 2026-11-02, on fdf0f7f, after the owner's external review): mockups and their sources only, no app code, no DEV, no Docker, no merge, no V1-2.5; STOP at the final graphic checkpoint, no approval recorded
- [x] F1 board 01: search by sheet name only, « Rechercher une fiche » (UX decision 4 withdrawn)
- [x] F2 board 06: distinct titles, failed « Vérification échouée » / unavailable « Vérification indisponible », explanations and exits kept
@@ -812,3 +814,4 @@ Apply when implementing B-phase:
- [x] F6 complementary board « Accès non autorisé », outside the twelve
- [x] F7 board 12 rows touched by F2, F4, F6; contact sheet, REVUE.md (labels: both reviews compared, nothing ratified), README line, contract §17.8, SHA256SUMS, new zip (9adbd3a, f9fc13c; zip `faunosteo-v1-2-4-maquettes-corrigees.zip` sha256 b5bd8abf…)
- [x] F8 fresh verifier on the new batch; open label arbitrations to the owner: ECARTS(1) = archive not yet built at check time, 15/16 met; archive built after, sums checked
- [x] owner arbitrations (brief « arbitrages propriétaire et préparation de validation finale », 2026-11-02, on c2a3147): A1 BDR-095, A2 board 05 whole horse at 768 px, A3 V1-2.7 lists on failure_outcome, A4 24 common labels + owner arbitrations, A5 affected boards + contact sheet + archive -3.zip; verifier ECARTS(2) → ECARTS(1) → CONFORME 21/21 (27e5727, 74aa8f6)