chore(memory): BDR-096 V1-2.4 graphic approval, TODO, journal

This commit is contained in:
bchanot committed 2026-11-02 15:38:53 +01:00
1 parent 567f27e37d
commit 410025715c
3 files changed
+19 -2

No files matched your search

+13
View File
@@ -732,3 +732,16 @@ Also: G1/G2 corrections validated, conformance 8/8 acknowledged; UX decisions 2-
4. No SQL model, business rule or closed code change.
**Rationale**: search by zone widens a slice already large; one title per outcome stops an unavailable service reading as bad content.
**Alternatives**: zone search (withdrawn); one title « Vérification échouée » + « indisponible » tag (replaced).
## BDR-096 — V1-2.4 GRAPHICAL APPROVED: 12 boards + « Accès non autorisé » page, last label arbitrations, V1-2.5 authorised on VERIFIED deps (2026-11-02) (2026-11-02)
- **Status**: accepted
**Decision**: owner brief « Validation propriétaire V1-2.4 » (2026-11-02, on 74aa8f6), after review of archive `faunosteo-v1-2-4-maquettes-arbitrages-3.zip`. **V1-2.4 GRAPHICAL APPROVED**: 12 boards `01`-`12` + complementary page « Accès non autorisé » = design reference V1-2.5 to V1-2.7. No board, source or rule changed by the record.
1. `object_conflict` FR: « Le contenu du fichier de l'illustration ne correspond pas à son empreinte SHA-256 enregistrée. » (meaning checked: stored bytes vs recorded sha256 key, `HashMismatch`). EN not arbitrated, checked at integration.
2. L14: « Access and permissions » in UI; `capability` stays technical term (§3 row unchanged).
3. L20: « Corriger le brouillon » / « Fix the draft » (content failure); « Modifier le brouillon » / « Edit the draft » (size limit).
4. L32: « Accès non autorisé » / « Access denied »; explanation + « Retour au tableau de bord » / « Back to dashboard » declared already decided (board 12 wordings).
5. Other technical messages (16 closed codes, L30 refusals) checked at integration, not blocking graphic closure. L15 2nd sentence not named by brief → stays open until V1-2.6.
6. Minor doc remarks fixable without new graphic review, boards untouched. Board 12 keeps older `object_conflict` text and « à arbitrer » marks; REVUE.md + contract §17.9 hold ratified wordings.
7. V1-2.5 authorised once §16.6 dependencies VERIFIED, existing contract only. Kept: no merge develop/main/release, no Supabase DEV op without own authorisation, no DEV worker, tests + independent review fit for step, commits + pushes on V1-2 branch, STOP at V1-2.5 checkpoint. Design not reopened without demonstrated defect or new owner decision.
**Rationale**: four review rounds (G1/G2, final corrections, arbitrations, verifier CONFORME 21/21) closed every graphic finding; remaining messages are integration-time checks against code.
**Alternatives**: regenerate board 12 with final wordings (rejected by brief: design not modified); hold approval until every message settled (rejected: owner closes graphics, messages at integration).