forked from bchanot/claude
ship-feature: STEP 0e CONTRACT (request verbatim) → ENRICHED at the STEP 3 validation gate (design criteria appended [gated <date>], the human micro-gate) → STEP 5 VERIFY+SECURE judges the branch against the ENRICHED contract via the shared include. Distinct axis from STEP 6 code review, both run (LRN-095). init-project: contract seeded from the PROJECT BRIEF (V1 features → criteria) → ENRICHED at VALIDATION GATE #1 → STEP 9 VERIFY+SECURE. Adds the security gate init-project previously lacked (was deferred to a later /onboard). onboard: explicit NO verify-loop — it produces an audit report, not a change to verify against a request; contract is scope-only, security-auditor runs MODE audit (report-only), never a gate. Documented to prevent a misplaced symmetry loop (BDR-050: dev pipeline != audit). lib/tests/no-vacuous-locks.test.sh: deterministic backstop for LRN-093 (2nd recurrence in this chantier → the advisory alone did not hold). Refuses a literal \n in any grep/tf/tr_/tn pattern across lib/tests/*.test.sh; flip-tested against a synthetic offender so the guard proves it bites. lib/tests/loops-heavy.test.sh: 18 structure locks green. Behavioral dogfood (both vigilance points, real): (1) enrichment — a fresh verifier reads and checks a [gated] design criterion (ECARTS naming it precisely); (2) escalation — 3 consecutive ECARTS on the same criterion → orchestrator STOPs at the max-3 bound + presents the CONTRACT-vs-REALIZED table, no 4th loop, no commit. First real exercise of the infinite-loop guard. Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01XpphkdTosUzokBDNG7PToS