forked from bchanot/claude
feat(gates): wire GATE 0 into the four orchestrator skill restatements
The include is authoritative, but feat/bugfix/ship-feature/init-project each restate the verify loop inline — an orchestrator following the restatement alone would have skipped the floor. Each now carries the GATE 0 bullet ahead of GATE 1 (4 new structure locks, flip-tested). The contract-interview weight table stops promising a hotfix oracle nothing executes: hotfix runs no floor, the hotfixer runs the suite itself. CHANGELOG extended with the wiring + the RED result.
This commit is contained in:
@@ -210,6 +210,11 @@ OPTIONS :
|
||||
Run the two fresh gates per `$HOME/.claude/lib/verify-secure-loop.md` with
|
||||
`CONTRACT` = the STEP 0e path (ENRICHED at STEP 3), `DIFF` = the branch diff
|
||||
(`develop..HEAD`), `TEST` = the project suite:
|
||||
- GATE 0 — deterministic floor, no dispatch: `bash ~/.claude/lib/gates.sh
|
||||
run "$CONTRACT"` executes the criteria's declared oracles fail-closed.
|
||||
UNMET → hand the dev with the NOT-MET rows verbatim — no
|
||||
verifier is spent on a red floor; own budget, max 3 → escalate.
|
||||
MET (an all-manual contract too) → GATE 1.
|
||||
- GATE 1 — a FRESH verifier judges the branch against the ENRICHED contract
|
||||
(all criteria, including the `[gated]` design ones). CONFORME → GATE 2.
|
||||
ECARTS → hand the dev the gap list, fix, re-verify, max 3 → STOP + human
|
||||
|
||||