Commit Graph
3 Commits
Author SHA1 Message Date
bchanot 0f8c9833cc docs(docs): V1-1 owner decisions N1-N9 and M1 as built
Contract: N4 voiding instead of deletion, N5 date constraints, N6 write budget per workspace under a lock, N7 effective-privilege wording and residual admin paths, N9 audit metadata limited to ids; M1 as-built notes and isolated-stack results (§8.1). SUPABASE.md §3.3 with the owner procedure to apply M1 on DEV without reset; backend architecture, test strategy, plan and CLAUDE.md lines.
2026-10-25 20:00:06 +01:00
bchanot ac60b24267 docs(docs): realign active docs on develop for P0
Roadmap section and step statuses in the plan, D-R9 Rust services in
place of Edge Functions and a Node worker, platform roles per BDR-026,
equine sheet draft-only, curation-only authoring until Step 17,
OPEN_QUESTIONS statuses and conflict resolutions, dated snapshot
notices on the Step 0 documents.
2026-10-25 17:12:37 +01:00
bchanot b0cce2cd8c docs(docs): add SaaS implementation plan and architecture docs (step 0)
Eight documents under docs/development/ confronting the approved business
architecture with the audited code: 27-step plan, repository migration map,
domain map, frontend/backend architecture, migration and test strategy,
open questions. Reference document placed at the repository root.
2026-10-08 21:41:39 +02:00