Contract: N4 voiding instead of deletion, N5 date constraints, N6 write budget per workspace under a lock, N7 effective-privilege wording and residual admin paths, N9 audit metadata limited to ids; M1 as-built notes and isolated-stack results (§8.1). SUPABASE.md §3.3 with the owner procedure to apply M1 on DEV without reset; backend architecture, test strategy, plan and CLAUDE.md lines.
Roadmap section and step statuses in the plan, D-R9 Rust services in
place of Edge Functions and a Node worker, platform roles per BDR-026,
equine sheet draft-only, curation-only authoring until Step 17,
OPEN_QUESTIONS statuses and conflict resolutions, dated snapshot
notices on the Step 0 documents.
Eight documents under docs/development/ confronting the approved business
architecture with the audited code: 27-step plan, repository migration map,
domain map, frontend/backend architecture, migration and test strategy,
open questions. Reference document placed at the repository root.