bchanot
255dd67f2c
chore(memory): journal — db:trial closure reviews
2026-11-11 14:44:14 +01:00
bchanot
b215b89cf9
chore(memory): BDR-110 R0 graphic validation
2026-11-09 17:42:44 +01:00
bchanot
a8c9b8377e
chore(memory): BDR-109 R0 graphic verdict
2026-11-09 17:01:27 +01:00
bchanot
45f1cce460
chore(memory): BDR-108 R0 owner decisions and graphic checkpoint
2026-11-09 16:27:47 +01:00
bchanot
95009069ca
chore(memory): BDR-107 trial arbitrations, R0-R4 and anomalies A-C tracking
2026-11-09 16:13:06 +01:00
bchanot
8cb681e2fa
chore(memory): U1 owner checkpoint decisions, RR-13, LRN-120 to 122
...
BDR-106 owner decisions at the U1 checkpoint; TODO U1 line closed up
to the open owner checkpoint, admin.spec:717 confirmation and kept
reservations; RR-13 rights list server paging track; contract
clarification; journal.
2026-11-09 12:47:42 +01:00
bchanot
1ed5c96e1b
docs(docs): U2b F5, F9-F21 ratified with F3, F8, F11-F14, F22 precisions
...
Owner brief « Ratification finale U1 et autorisation conditionnelle
d'implémentation » (BDR-105): study §6 tests, §7 table, 7.2, 7.3,
UX plan U2b entry, REVUE and decisions pointer. No implementation.
2026-11-06 17:12:30 +01:00
bchanot
7defed1c55
chore(memory): BDR-104, U1 plan challenge reports, checkpoint contract
2026-11-06 15:53:43 +01:00
bchanot
a43145a03f
chore(memory): BDR-103, LRN-119, U2b decisions contract and TODO
2026-11-06 14:56:50 +01:00
bchanot
846994b4ab
chore(memory): BDR-102, T17 answered
2026-11-06 11:12:18 +01:00
bchanot
452a346f17
chore(memory): BDR-101, TODO and journal for V1-2.6 U0
2026-11-06 11:06:12 +01:00
bchanot
a505b24bfd
chore(memory): BDR-100, LRN-118, TODO and journal for the V1-2.6 ratification
2026-11-05 19:06:48 +01:00
bchanot
e10f167a6d
chore(memory): journal, V1-2.6 UX technical preparation
2026-11-05 17:33:00 +01:00
bchanot
f58cf2308f
chore(memory): journal, V1-2.6 maquettes final corrections
2026-11-05 16:15:29 +01:00
bchanot
7722433a1c
chore(memory): journal, V1-2.6 maquettes review archive
2026-11-05 15:36:44 +01:00
bchanot
46ea996a61
docs(docs): V1-2.6 graphic editor maquettes and core feasibility audit
2026-11-05 15:16:28 +01:00
bchanot
37c9fdf6eb
chore(memory): V1-2.6 ready for the owner trial on the LAN
2026-11-04 23:58:24 +01:00
bchanot
c2237a2f2f
chore(memory): V1-2.6 ready for the owner trial
2026-11-04 21:17:28 +01:00
bchanot
67480b2fc2
chore(memory): LRN-115 to LRN-117, EVAL-042 from the V1-2.6 checkpoint
2026-11-04 19:14:56 +01:00
bchanot
283e459077
chore(memory): V1-2.6 lot M closed, owner checkpoint
2026-11-04 19:09:43 +01:00
bchanot
7bf1404946
chore(memory): LRN-114 worktree loss, durable worktree, V1-2.6 execution ledger
2026-11-04 13:26:04 +01:00
bchanot
2571978780
chore(memory): V1-2.6 owner GO, C26 repair rules, C32-C34
2026-11-04 11:32:18 +01:00
bchanot
f34381c242
chore(memory): V1-2.6 owner arbitrations, plan revised, re-check REMAINING(1)
2026-11-03 22:04:29 +01:00
bchanot
4657abf1e3
chore(memory): V1-2.6 plan, contract, gate re-check REMAINING(2)
2026-11-03 21:27:30 +01:00
bchanot
7f618d05a2
chore(memory): BDR-099 V1-2.5 decisions, LRN-113 TOTP reuse, Storage 409, sandbox order
2026-11-03 11:05:44 +01:00
bchanot
b4415a382f
chore(memory): V1-2.5 VERIFIED after owner checkpoint corrections, journal
2026-11-03 00:14:26 +01:00
bchanot
14ff890761
chore(memory): V1-2.5 checkpoint, LRN on inert drawer and GoTrue MFA, journal
2026-11-02 19:49:38 +01:00
bchanot
ff9d5c4a3d
chore(memory): BDR-098 deprecated fingerprint
2026-11-02 17:18:28 +01:00
bchanot
a701b04210
chore(memory): BDR-097 V1-2.5 start decisions, TODO plan
2026-11-02 16:06:55 +01:00
bchanot
410025715c
chore(memory): BDR-096 V1-2.4 graphic approval, TODO, journal
2026-11-02 15:38:53 +01:00
bchanot
74aa8f6099
chore(memory): BDR-095, V1-2.4 label arbitrations, journal
2026-11-02 14:52:37 +01:00
bchanot
c2a3147293
chore(memory): V1-2.4 final graphic corrections, journal
2026-11-02 14:01:19 +01:00
bchanot
fdf0f7f023
chore(memory): BDR-094 V1-2.4 catalogue access UX, journal
2026-11-02 12:53:29 +01:00
bchanot
1a68cd8351
chore(memory): V1-2.4 G1/G2 corrections, verifier CONFORME, journal
2026-11-02 12:44:41 +01:00
bchanot
a15c35ca66
chore(memory): V1-2.4 open UX decisions, journal
2026-11-02 01:00:41 +01:00
bchanot
8191e3a42c
chore(memory): DEV read incident report, LRN-110 supersedes LRN-102
2026-11-02 00:25:30 +01:00
bchanot
9c4603755e
chore(memory): journal, DEV read incidents
2026-11-02 00:11:51 +01:00
bchanot
8db62b43e2
chore(memory): BDR-093 V1-2.3 verified, CPU-contention MEDIUM accepted temporarily
2026-11-02 00:09:03 +01:00
bchanot
57b93afae6
chore(memory): V1-2.3 closure verified, journal
2026-11-01 23:47:04 +01:00
bchanot
26e4b1b0ee
chore(memory): V1-2.3 reserves verified, journal
2026-11-01 22:01:06 +01:00
bchanot
a6de7d6b94
chore(memory): V1-2.3 reserves contract, plan, LRN-109 brk
2026-11-01 21:03:00 +01:00
bchanot
a48aaf7499
chore(memory): journal V1-2.2 closure and V1-2.3 build
2026-11-01 18:03:57 +01:00
bchanot
5eca08688a
chore(memory): V1-2.2 closure, mutations rerun on final code, BDR-092, LRN-108, V1-2.3 contract
2026-11-01 16:38:53 +01:00
bchanot
e190dfc794
chore(memory): V1-2.2 interior rule evidence, tools, LRN-105..107
2026-11-01 13:40:57 +01:00
bchanot
de2dfb392e
chore(memory): V1-2.2 owner decisions evidence, BDR-091, LRN-103/104
2026-11-01 02:01:50 +01:00
bchanot
f1bb19b30b
chore(memory): V1-2.2 three MEDIUM evidence, lot B patch, contract, TODO, journal
2026-10-31 23:39:40 +01:00
bchanot
958228a9de
chore(memory): V1-2.2 root visibility evidence, A6 decision, BDR-089/090, LRN-102
2026-10-30 18:56:49 +01:00
bchanot
81f7639c75
chore(memory): V1-2.2 reserved ids evidence, mutations, contract, TODO
2026-10-30 17:31:01 +01:00
bchanot
2f1f0764bf
docs(docs): V1-2.2 finalisation review drift, canvas size cap, TODO
2026-10-30 15:21:05 +01:00
bchanot
f976f33307
chore(memory): V1-2.2 finalisation, A6 scope, BDR-088, LRN-101, floor wording
2026-10-30 15:05:56 +01:00