chore(memory): BDR-061 R4.4 validated, R4.5 go; R4.5 subtasks
This commit is contained in:
1 parent
4874913669
commit
e0540ed006
3 files changed
+14
-1
No files matched your search
@@ -290,3 +290,4 @@ Owner validated R4.0 plan with conditions (BDR-057, plan §A.6, LRN-059/060). R3
|
||||
- 2026-10-18 owner: J1 authorised with both WebKit reserves (BDR-059), cap 50 MiB kept, no streaming scanner, criterion 10 MiB / 5 imports kept with same-page vs navigation split + control. Kit generated (../faunosteo-j1-kit, 13 MB, L report as rescue copy for the 42 MB export), R4_J1_RESULTS.md template. STOP: waiting for device results; no merge, no R4.4.
|
||||
- 2026-10-18 J1 partial: owner ran the functional checks on a computer, no failure (browser/version, timings pending); iPhone not available, deferred → stays NON TESTÉ, blocks final R4.3 acceptance (OD-6). Proposed: continue R4.4 on the branch with the iPhone J1 as a blocking item before any merge; waiting for the owner's decision. No merge, no R4.4 started.
|
||||
- 2026-10-18 R4.4 done (70007e0, 1550d21): pdf::write text/afm_data/dates (O4 55,992 widths bit-exact, 1,168 wraps, safeText every code point, upper 1,580 = Rust to_uppercase, O5 tables, O6 6,468 cells), input checks, layouts → DrawLog; O1 12 runs 2,124 calls equal, step6 text/images 24 derived. Layout L 3 ms, CAP 24 ms release. Nothing wired, module size unchanged. STOP before R4.5.
|
||||
- 2026-10-18 owner validated R4.4; R4.5 go (BDR-061). Subtasks R4.5a-f in TODO. Tooling present: qpdf 12.3.2, poppler 26.01 (pdftoppm, pdfdetach), crates.io reachable.
|
||||
Reference in new issue
Block a user