docs(docs): V1-2.3 closure adjustments, review and gates

This commit is contained in:
bchanot committed 2026-11-01 23:24:19 +01:00
1 parent 3c141c942b
commit bb8acbe663
2 files changed
+14 -2

No files matched your search

+2 -2
View File
@@ -647,12 +647,12 @@ Order (BDR-071): P0 docs + decisions → V1-1 clients and animals → V1-2 sheet
- [x] residual risk 4, closed: sandbox throwaway password literal replaced by per-run random passwords (2a84e37); DEV seed passwords untouched
- [ ] §16.11 queue inventory (avatars, purges) owed by the owner before any DEV activation; not done, not assumed
- [ ] R closure adjustments (brief « Validation V1-2.3 (M6) et derniers ajustements », on 26e4b1b: V1-2.3 VERIFIED technically; contract `.claude/tasks/contracts/2026-11-01-v1-2-3-closure.md`): sandbox only, no DEV, no merge, then prepare V1-2.4 scope and STOP
- [ ] C1 retry by cause: resource_limit (intrinsic) + verdict_refused definitive at first; timeout, unavailable (incl. external SIGKILL), lease_expired transient
- [x] C1 retry by cause: resource_limit (intrinsic) + verdict_refused definitive at first; timeout, unavailable (incl. external SIGKILL), lease_expired transient
- [x] C2 avatar-e2e port 57800 loopback, occupied port fails, suite refuses non-sandbox targets
- [x] C3 `pnpm e2e:avatar` = alias of the sandbox run, scripts/avatar-e2e.sh removed, references updated
- [x] C4 sandbox seeded accounts get a per-session secret (no DEV seed password dependency)
- [x] C5 four historical test reductions recorded in `.claude/audits/2026-11-01-v1-2-floor-reductions.md`: none hides a security coverage (O22 mirror removal and client gate, server gate tested; one false positive)
- [ ] C6 gates + targeted independent review + verifier · C7 V1-2.4 scope prepared
- [x] C6 gates on 3c141c9 (check:all, test-db 1898, test 87, verify-e2e 10/10, e2e:avatar 5/5, e2e:shell 86, DEV untouched); targeted review PASS, 3 LOWs fixed, MEDIUM CPU-contention timeout + 3 LOWs open for owner; verifier pending · C7 V1-2.4 scope `.claude/tasks/contracts/2026-11-01-v1-2-4-wireframes-scope.md`
- [ ] V1-2.4 wireframes (editor, review, admin entry) · V1-2.5 catalogue, admin space, rights, species, MFA · V1-2.6 editor level 1 · V1-2.7 preview, review, publication UI · V1-2.8 equine working copy and review preparation · V1-2.9 FR/EN acceptance and closure (owner checkpoints V1-2.3, V1-2.4, V1-2.6, V1-2.7, V1-2.8, V1-2.9 + each DEV operation of contract §16.11)
## Release readiness track (owner 2026-10-25, distinct from the functional roadmap; nothing here authorises a release or exposure)