chore(memory): V1-2.5 VERIFIED after owner checkpoint corrections, journal

This commit is contained in:
bchanot committed 2026-11-03 00:14:26 +01:00
1 parent 431999e45c
commit b4415a382f
2 files changed
+5 -2

No files matched your search

+3
View File
@@ -511,3 +511,6 @@ R5.4: `draft/{labels,changelog,review_report,drawing,overlay,app_review,svg_comp
- 2026-11-02 V1-2.4 owner arbitrations: BDR-095 (sheet-name search replaces BDR-094 zone item, distinct failed/unavailable titles, V1-2.7 lists on failure_outcome), board 05 whole horse at 768 px, 24 common labels + owner arbitrations ratified, object_conflict kept open (meaning = hash mismatch). Verifier ECARTS(2) → ECARTS(1) → CONFORME 21/21 incl. archive -3.zip. No global graphic approval.
- 2026-11-02 V1-2.4 GRAPHICAL APPROVED by owner (BDR-096): 12 boards + « Accès non autorisé » page, no board regenerated; object_conflict FR, L20 EN, L32 EN ratified, L14 confirmed; L15 2nd sentence + code messages open, checked at integration. Recorded contract §16.5/§17.9, maquettes contract, REVUE.md, design README, TODO. Next: V1-2.5 prerequisites.
- 2026-11-02 V1-2.5 built + tested on sandbox (A-K): MFA proofs 10/10 no STOP, M7 admin reads + deprecated fingerprint (BDR-097/098), access layer, shell/step-up/MFA UI, admin, catalogue, e2e A0 A1 S1 P1. pgTAP 1941, unit 66/148/655, e2e:shell 108+6 skip, check:all green. Security PASS; verifier ECARTS(7)->ECARTS(1)->ECARTS(1)->CONFORME. Phone e2e flake root-caused (inert closing drawer). DEV untouched, no merge. Checkpoint.
## 2026-11-03
- 2026-11-03 V1-2.5 owner checkpoint corrections (f5456f3): three permission states (creation page order loading, server refusal, failed read, editor rule; admin home notice; reloadAccess keeps held roles), Paris end-of-day expiry, species order 0..9999 in M7, labels, TOTP reuse measured (code accepted by several sessions in step N and N+1, refused N+2), lost-factor review = production prerequisite. 2 state-dependent sandbox tests fixed. Gates green on fresh stack, security PASS, verifier CONFORME. V1-2.5 VERIFIED. No DEV, no merge.
+2 -2
View File
@@ -654,7 +654,7 @@ Order (BDR-071): P0 docs + decisions → V1-1 clients and animals → V1-2 sheet
- [x] C5 four historical test reductions recorded in `.claude/audits/2026-11-01-v1-2-floor-reductions.md`: none hides a security coverage (O22 mirror removal and client gate, server gate tested; one false positive)
- [x] C6 gates on 3c141c9 (check:all, test-db 1898, test 87, verify-e2e 10/10, e2e:avatar 5/5, e2e:shell 86, DEV untouched); targeted review PASS, 3 LOWs fixed, MEDIUM CPU-contention timeout + 3 LOWs open for owner; verifier ECARTS(1) (STORAGE §6 DEV pairing) → fixed 093083d, delta verifier CONFORME · C7 V1-2.4 scope `.claude/tasks/contracts/2026-11-01-v1-2-4-wireframes-scope.md`
- [x] V1-2.4 wireframes (editor, review, admin entry): GRAPHICAL APPROVED 2026-11-02 (BDR-096; detail under S below)
- [ ] V1-2.5 BUILT + TESTED on the sandbox, CHECKPOINT pending owner (5db85ff); started 2026-11-02 (brief « Validation propriétaire V1-2.4 »; prerequisites checked on 994b04e, contract §17.10; owner answers BDR-097: M7 admin reads, working-copy action in V1-2.5, EN « Permission »). Contract `.claude/tasks/contracts/2026-11-02-v1-2-5-admin-catalogue.md`, plan `.claude/tasks/plans/2026-11-02-v1-2-5.md`; sandbox only, no DEV, no worker on DEV, no merge; STOP at the V1-2.5 checkpoint
- [x] V1-2.5 VERIFIED 2026-11-03 after the owner checkpoint corrections (final code f5456f3; brief « V1-2.5 : décisions propriétaire au checkpoint »); built + tested on the sandbox (5db85ff); started 2026-11-02 (brief « Validation propriétaire V1-2.4 »; prerequisites checked on 994b04e, contract §17.10; owner answers BDR-097: M7 admin reads, working-copy action in V1-2.5, EN « Permission »). Contract `.claude/tasks/contracts/2026-11-02-v1-2-5-admin-catalogue.md`, plan `.claude/tasks/plans/2026-11-02-v1-2-5.md`; sandbox only, no DEV, no worker on DEV, no merge; STOP at the V1-2.5 checkpoint
- [x] A GoTrue MFA behaviour on the sandbox (C1): 10/10, no STOP; reset and password change need aal2 once a factor is verified (IDENTITY §4.1) (78791bf)
- [x] B M7 sheet_admin_reads + pgTAP 022 (40) + types; fresh + upgrade from M6: 1938 pass (b0a4cbe)
- [x] C core op sheet.empty + wasm + ts-rs; rust:check 2384, core-wasm 66 (bbab0e6)
@@ -670,7 +670,7 @@ Order (BDR-071): P0 docs + decisions → V1-1 clients and animals → V1-2 sheet
- [x] L1 three permission states (creation page + Administration home), reloadAccess, unit + e2e: app 671, e2e:shell 110 + 8 skipped, pgTAP 1941 (fresh sandbox)
- [x] L2 expiry end of day Europe/Paris, species order 0..9 999 in M7, labels, TOTP key test: app 696, supabase 148, pgTAP 1965 fresh + upgrade, types match
- [x] L3 TOTP reuse measured (code accepted by several sessions in its step and the next, refused at N+2), lost-authenticator review (production prerequisite), decisions in docs; sandbox test 103 + 10 skipped x2
- [ ] L4 gates (check:all, sandbox test-db fresh + upgrade, test, e2e:shell), fresh verifier + security, memory, checkpoint with V1-2.6 scope
- [x] L4 gates: check:all green (dcb1a94; delta = sandbox test + docs), fresh stack test-db 1965, e2e:shell 110 + 8 skipped, sandbox test 103 + 10 skipped after e2e, upgrade from M6 1965 + types match; security PASS x2; verifier ECARTS(6) -> CONFORME; two state-dependent sandbox tests fixed (0499a39, f5456f3); suites need a fresh stack in order test-db, e2e:shell, test
- [ ] V1-2.5 catalogue, admin space, rights, species, MFA · V1-2.6 editor level 1 · V1-2.7 preview, review, publication UI · V1-2.8 equine working copy and review preparation · V1-2.9 FR/EN acceptance and closure (owner checkpoints V1-2.3, V1-2.4, V1-2.6, V1-2.7, V1-2.8, V1-2.9 + each DEV operation of contract §16.11)
## Release readiness track (owner 2026-10-25, distinct from the functional roadmap; nothing here authorises a release or exposure)