chore(memory): R2 finish BDR-116, LRN-136..138, BLK-015 note, plan and contract
This commit is contained in:
1 parent
3a7ffa2f8b
commit
afc1051313
6 files changed
+469
No files matched your search
@@ -560,3 +560,4 @@ R5.4: `draft/{labels,changelog,review_report,drawing,overlay,app_review,svg_comp
|
||||
|
||||
## 2026-11-13
|
||||
- R2 corrections 2026-11-13: C0 admin.spec diagnosis (A/B + dose-response, accumulation, BLK-015 open), C1-C5 + final review I1 + verifier gap fixed (3303530..538ce27), sweep 221p/5f admin.spec only, guard OK, verifier CONFORME; stopped at R2 checkpoint for db:trial trial.
|
||||
- 2026-11-13 R2 UX finish built (553a0e5..021685f): dialogs, history Back/Forward, filter chip, Plus overlay, sticky sidebar; final review fixes; gates green, shell sweep fails only admin.spec (BLK-015); awaiting owner db:trial trial
|
||||
Reference in new issue
Block a user