chore(memory): BDR-097 V1-2.5 start decisions, TODO plan

This commit is contained in:
bchanot committed 2026-11-02 16:06:55 +01:00
1 parent 3d80812cdb
commit a701b04210
2 files changed
+21

No files matched your search

+12
View File
@@ -654,6 +654,18 @@ Order (BDR-071): P0 docs + decisions → V1-1 clients and animals → V1-2 sheet
- [x] C5 four historical test reductions recorded in `.claude/audits/2026-11-01-v1-2-floor-reductions.md`: none hides a security coverage (O22 mirror removal and client gate, server gate tested; one false positive)
- [x] C6 gates on 3c141c9 (check:all, test-db 1898, test 87, verify-e2e 10/10, e2e:avatar 5/5, e2e:shell 86, DEV untouched); targeted review PASS, 3 LOWs fixed, MEDIUM CPU-contention timeout + 3 LOWs open for owner; verifier ECARTS(1) (STORAGE §6 DEV pairing) → fixed 093083d, delta verifier CONFORME · C7 V1-2.4 scope `.claude/tasks/contracts/2026-11-01-v1-2-4-wireframes-scope.md`
- [x] V1-2.4 wireframes (editor, review, admin entry): GRAPHICAL APPROVED 2026-11-02 (BDR-096; detail under S below)
- [ ] V1-2.5 started 2026-11-02 (brief « Validation propriétaire V1-2.4 »; prerequisites checked on 994b04e, contract §17.10; owner answers BDR-097: M7 admin reads, working-copy action in V1-2.5, EN « Permission »). Contract `.claude/tasks/contracts/2026-11-02-v1-2-5-admin-catalogue.md`, plan `.claude/tasks/plans/2026-11-02-v1-2-5.md`; sandbox only, no DEV, no worker on DEV, no merge; STOP at the V1-2.5 checkpoint
- [ ] A GoTrue MFA behaviour on the sandbox (C1; STOP if aal1 enrols a second factor or removes a verified one)
- [ ] B M7 sheet_admin_reads + pgTAP 022 + types (C9)
- [ ] C core op sheet.empty + wasm + ts-rs (C5)
- [ ] D packages/supabase accessors + kinds (C1-C9)
- [ ] E shell: nav, RequireCatalog, RequireAdmin step-up, « Accès non autorisé » (C3, C4)
- [ ] F Mon compte Sécurité MFA + step-up screen (C2)
- [ ] G Administration page, species, rights (C4, C6, C7)
- [ ] H sheets list, creation, overview, working copy (C5)
- [ ] I catalogue list, sheet page, version page (C8)
- [ ] J e2e:shell A0 A1 S1 P1 + access + MFA + axe + viewports (C11)
- [ ] K docs, check:all, fresh verifier + security, memory, checkpoint (C10-C12)
- [ ] V1-2.5 catalogue, admin space, rights, species, MFA · V1-2.6 editor level 1 · V1-2.7 preview, review, publication UI · V1-2.8 equine working copy and review preparation · V1-2.9 FR/EN acceptance and closure (owner checkpoints V1-2.3, V1-2.4, V1-2.6, V1-2.7, V1-2.8, V1-2.9 + each DEV operation of contract §16.11)
## Release readiness track (owner 2026-10-25, distinct from the functional roadmap; nothing here authorises a release or exposure)