chore(memory): BDR-103, LRN-119, U2b decisions contract and TODO

This commit is contained in:
bchanot committed 2026-11-06 14:56:50 +01:00
1 parent 604f502b44
commit a43145a03f
5 files changed
+183 -1

No files matched your search

+1
View File
@@ -535,3 +535,4 @@ R5.4: `draft/{labels,changelog,review_report,drawing,overlay,app_review,svg_comp
## 2026-11-06
- V1-2.6 U0 (docs only, BDR-101): V1-2 contract §6.2/§6.4 (draft rounds)/§6.7/§7.4/§8.2-8.4/§12.2 O22 (save + approval/publication fixed-category checks, not built)/§16.7/§16.12/§17.12; level-1 C3-C40 notes; design README v1-2-6 validated; rules sheet-model/schemas; 5 UX docs. T17, T12, T6, T14, T1 open. Verifier ECARTS(1) x2 fixed. No code, no DEV.
- V1-2.6 U2b principle approved by owner (BDR-103): U2b after U2; F1/F2/F6/F8/F22 decided, F7 term, F3/F4 partial; study §7 table F1-F22 with alternatives + consequences, F2 groups open (730 vs 627 leaves), F3 fields, F4 facet model; LRN-119 Activity. U1 plan 2e46c14 untouched. Docs only, no DEV.