docs(docs): V1-2.6 state with the sandbox suites in contract order

This commit is contained in:
bchanot committed 2026-11-04 18:55:56 +01:00
1 parent 2b10471b0a
commit 7a4ce9eb58
2 files changed
+13 -4

No files matched your search

@@ -146,6 +146,14 @@ only. This file holds every ruling, finding and checkpoint needed to resume; the
« keep » except L trial.config / path / 4.3.1 (done). Second verifier pass: C19 marker wordings, C25 two header
copy strings, C22 final-HEAD check:all + security, floor waivers on the 375 px skips: fix round 3.
- Final gates. My first two chains ran `pnpm test:run` as the third step; the contract's `test` is
`pnpm db:sandbox test` on the same fresh stack after `e2e:shell` (LRN-113), caught by the third fresh verifier
(C22 NOT MET, 32/34 MET otherwise). Re-run in the exact order on 697cefa. Security gate on 5bd1226: PASS, LOWs:
trial dev server not pinned to loopback in its own config (fixed 697cefa), Vite inherits PGPASSWORD in
`cmd_trial` (kept: never exposed to the browser; `env -u PGPASSWORD` before the merge), template SQL in e2e
helpers against the throwaway sandbox (kept, same idiom as the existing sandbox suites). Verifier note fixed:
EN hints named the tab « Views and illustrations » (3831a49).
## Questions for the owner at the checkpoint (not decided)
- The 10 format-only uncommitted changes under `apps/app/src/editor/state/` (R12): revert (`git checkout -- apps/app/src/editor/state`) or keep.
+5 -4
View File
@@ -2338,10 +2338,11 @@ V1-2.7 on.
recovery, E route, modes and conflict, F to J the seven tabs and the
submission, K the `e2e:shell` journeys, L the owner trial commands
(`pnpm db:sandbox trial`) and `docs/development/V1-2-6_OWNER_TRIAL.md`.
Fresh sandbox in the order `test-db → e2e:shell → test`: pgTAP 1992,
`e2e:shell` 148 passed (46 skipped by design: editing needs 1 024 px), unit
app 1033, supabase 159, core-wasm 66; `check:all` and
`r5:import-equine --check` green on the final code. Commit latency on the equine copy
One fresh sandbox in the order `test-db → e2e:shell → test`: pgTAP 1992,
`e2e:shell` 148 passed (46 skipped by design: editing needs 1 024 px),
`db:sandbox test` 105 passed (10 skipped); unit app 1033, supabase 159,
core-wasm 66; `check:all` and `r5:import-equine --check` green on the
final code. Commit latency on the equine copy
under 61 ms (budget 500 ms). Only measured views are editable (owner
2026-11-04); the AAL2 residual of §13 stays open. DEV untouched; the owner
has not tried the editor yet.