chore(memory): BDR-095, V1-2.4 label arbitrations, journal

This commit is contained in:
bchanot committed 2026-11-02 14:52:37 +01:00
1 parent 27e5727cca
commit 74aa8f6099
3 files changed
+12 -1

No files matched your search

+1 -1
View File
@@ -803,7 +803,7 @@ Apply when implementing B-phase:
- [ ] still vulnerable, owner decision needed: develop `pnpm e2e:avatar` (scripts/avatar-e2e.sh: DEV keys, worker on DEV, writes, purge expedite); main checkout (feature/v1-1-clients-animals) and worktree old-958228a hold both old scripts on disk; main and release/0.2.0 hold neither. Agents never run them.
- [ ] V1-2.4 maquettes: design review (4 MUST-FIX, 10 SHOULD) applied, boards re-rendered; sheet-assets V1-2 security PASS, LOWs open: one sandbox e2e at a time (shared gateway name and port), PGPASSWORD reaches the sheet-assets build, issuer claim not signature, gateway left after SIGKILL; verifier ECARTS(2) on a15c35c (G1 phantom warning board 06, G2 « Mark as reviewed » shown ratified) → owner-authorised text fixes + fingerprint / verdict_refused messages, only 06 and 12 re-rendered, contact sheet + `docs/design/v1-2-4/REVUE.md` (98e8403); fresh verifier CONFORME; graphic checkpoint: owner visual validation of the 12 boards and 31 FR/EN labels pending
- [x] UX decisions 2-11 ratified, item 3 settled (hidden entry, « Accès non autorisé », signed out → login), reviewer-only keeps limited « Administration », §6.5 alert divergence recorded: BDR-094, contract §5.3, §6.5, §11.1, §17.8, REVUE.md (L32 « Accès non autorisé » EN to arbitrate)
- [ ] owner: visual validation of the 12 boards, 32 FR/EN labels (L1-L32)
- [ ] owner: global visual validation of the 12 boards + complement; open labels L15 2nd sentence, L20 EN, L32 EN/explanation, object_conflict, 16 other code messages
- [ ] final graphic corrections (brief « V1-2.4 : dernières corrections graphiques », 2026-11-02, on fdf0f7f, after the owner's external review): mockups and their sources only, no app code, no DEV, no Docker, no merge, no V1-2.5; STOP at the final graphic checkpoint, no approval recorded
- [x] F1 board 01: search by sheet name only, « Rechercher une fiche » (UX decision 4 withdrawn)
- [x] F2 board 06: distinct titles, failed « Vérification échouée » / unavailable « Vérification indisponible », explanations and exits kept