docs: step 5 migration analysis (report v3, adapter + migration map, sheet provider, annotation layer, service/store split, risks, tests, decisions D1–D8); TODO plan; plan note
This commit is contained in:
1 parent
ce3d9634b3
commit
734c0d91fd
4 files changed
+386
No files matched your search
@@ -189,3 +189,4 @@ Step 4 validated + finished into develop. User decisions on the 7 open points
|
||||
- 2026-10-10 Step 4c on feature/step-04c-equine-curation: Docker `faunosteo_` convention (BDR-035); schema v2 (references, review_status, count_range; migration 20261010100000, pgTAP 008); curation pipeline (executor) + review overlays; 4 research agents (skull, axial, limbs, osteo/legal) → 44 changes / 679 ops / 48 refs authored from scratch python modules; draft 811 nodes, 28 annotations, 0 integrity errors; 9 points moved, carpus added, 9 questions for the osteopath. Root check green, real stack pgTAP + types clean, docker build OK. BDR-036, LRN-042. Gates next; stop for user validation; no publication.
|
||||
- Gates 4c: verifier ×3 (4→2→1 écarts, last 3 doc lines fixed by hand at cap), executor closed the applier rule + typed tests; security PASS (LOW url scheme → SQL rule `reference.url.scheme`). Real stack 267/267, Storage e2e OK. EVAL-010. Awaiting user validation; `.env.example` COMPOSE_PROJECT_NAME left to the user (file denied).
|
||||
- Step 4c VALIDATED by user 2026-10-10 → tracking: head view check documented (spec §6), BLK-008 migration limit, BDR-037, DEPLOY.md `.env.example` note. Finished into develop. Next: Step 5 (app on the canonical sheet), design points flagged before any UI work.
|
||||
- Step 5 preparation (2026-10-10): 4 analyzer agents (core/store, rendering, PDF, tests) + plan/spec reading → docs/development/STEP5_MIGRATION_ANALYSIS.md on chore/step-05-migration-analysis. Key facts: all 27 legacy data-anno-ids differ from canonical ids; 170/612 legacy finding paths moved/removed by curation → generated report-migration-map; markers never drawn by the app (in the SVG); PDF depends on markers only for the highlight; 66 tests import the registry. 8 decisions D1–D8 await the user. No implementation.
|
||||
Reference in new issue
Block a user