chore(memory): journal + TODO 6.8 after the first manual-test round

This commit is contained in:
bchanot committed 2026-10-11 16:16:14 +02:00
1 parent e8f1734424
commit 6688c3c60e
2 files changed
+5 -1

No files matched your search

+1 -1
View File
@@ -108,7 +108,7 @@ feat/findings-tree-v2 merged (FindingsTreePicker tracked in HEAD); all work belo
- [x] 6.4 Phase 3 packages/pdf (c179560: 53 engine tests, 36 goldens exact, resvg raster, demo envelope 55 KB / 136 KB stored): scaffold (no DOM lib, restricted globals, vitest node, Dockerfile, CI, README), svg/sanitize allowlist + horse.svg zero-removal, render moved, Branding/Rasterizer/exportedAt/safeText/dict, exportReportArchive (T3 both logo modes), readReportArchive (filename-first, layered, attachment_stripped; T4-T6, T8), T1/T7/T9/T10 resvg/T11, xmldom bundle size ≤ 50 KB gz
- [x] 6.5 Phase 4 app (9bd5173: 222 app tests, archive kept in session, rebase + alerts, legacy PDF modules removed, xmldom ≈ 31 KB gz in the main chunk): browserRasterizer, branding.ts, export/import on the engine, rebase on import + draft restore, 2 new messages, old render/attachment/highlight code + pdf.* keys removed, report:compare on engine API, T2/T14/T15, suite migrated 1:1
- [x] 6.6 Phase 5 docs + gates (docs synced; verifier ECARTS(31 oracle/scope) → CONFORME 13/13; security BLOCK(1) → 4 fix loops → PASS; 656 tests, build, docker ×4 green)
- [ ] 6.8 AWAITING USER: manual validation (protocol in the end-of-step report), UX decision for "re-export the kept archive" (store + engine ready, no button), wording of the 4 import messages; then finish into develop and Milestone A release 0.2.0: PDF-FORMAT.md real, CLAUDE.md map, WORKSPACE.md rule, DEPLOY.md rollback note, CHANGELOG, BDR-014 note; pnpm check, docker build, verifier + security gates, EVAL; manual validation list
- [ ] 6.8 user manual tests round 1 (2026-10-11): logos absent in their PDFs → not reproduced in 4 environments; branding bundled, export warnings surfaced (293a6e0); blur in the findings picker → not reproduced (headless, no layer/animation left); restore-rebase alert added (e8f1734); PDF_IMPORT_HARDENING.md written. AWAITING USER: browser + zoom + screenshot for the blur (A/B recipe in the report), UX choice for "re-export the archive", validation of the 6 message labels; then merge decision
- [ ] 6.7 follow-ups recorded for Step 13: catalog asset cap aligned with the archive cap (2 MiB), allowlist sanitiser at upload, app canvas sanitiser (EVAL-011)
- [ ] 5 follow-up: allowlist SVG sanitiser before Storage-served assets (Step 13); orphan findings UX (D5) at the report UX step; report:compare residuals (ZodError reason genericised, v3 lines computed once, long template lines); 16 MiB attachment cap without direct test