chore(memory): V1-2.3 closure verified, journal

This commit is contained in:
bchanot committed 2026-11-01 23:47:04 +01:00
1 parent 093083da07
commit 57b93afae6
3 files changed
+3 -2

No files matched your search

+1 -1
View File
@@ -652,7 +652,7 @@ Order (BDR-071): P0 docs + decisions → V1-1 clients and animals → V1-2 sheet
- [x] C3 `pnpm e2e:avatar` = alias of the sandbox run, scripts/avatar-e2e.sh removed, references updated
- [x] C4 sandbox seeded accounts get a per-session secret (no DEV seed password dependency)
- [x] C5 four historical test reductions recorded in `.claude/audits/2026-11-01-v1-2-floor-reductions.md`: none hides a security coverage (O22 mirror removal and client gate, server gate tested; one false positive)
- [x] C6 gates on 3c141c9 (check:all, test-db 1898, test 87, verify-e2e 10/10, e2e:avatar 5/5, e2e:shell 86, DEV untouched); targeted review PASS, 3 LOWs fixed, MEDIUM CPU-contention timeout + 3 LOWs open for owner; verifier pending · C7 V1-2.4 scope `.claude/tasks/contracts/2026-11-01-v1-2-4-wireframes-scope.md`
- [x] C6 gates on 3c141c9 (check:all, test-db 1898, test 87, verify-e2e 10/10, e2e:avatar 5/5, e2e:shell 86, DEV untouched); targeted review PASS, 3 LOWs fixed, MEDIUM CPU-contention timeout + 3 LOWs open for owner; verifier ECARTS(1) (STORAGE §6 DEV pairing) → fixed 093083d, delta verifier CONFORME · C7 V1-2.4 scope `.claude/tasks/contracts/2026-11-01-v1-2-4-wireframes-scope.md`
- [ ] V1-2.4 wireframes (editor, review, admin entry) · V1-2.5 catalogue, admin space, rights, species, MFA · V1-2.6 editor level 1 · V1-2.7 preview, review, publication UI · V1-2.8 equine working copy and review preparation · V1-2.9 FR/EN acceptance and closure (owner checkpoints V1-2.3, V1-2.4, V1-2.6, V1-2.7, V1-2.8, V1-2.9 + each DEV operation of contract §16.11)
## Release readiness track (owner 2026-10-25, distinct from the functional roadmap; nothing here authorises a release or exposure)