chore(memory): V1-2.2 arbitration criteria, mutation script, TODO

This commit is contained in:
bchanot committed 2026-10-29 16:24:30 +01:00
1 parent 93e4e81bda
commit 5281337412
3 files changed
+63

No files matched your search

+8
View File
@@ -572,6 +572,14 @@ Order (BDR-071): P0 docs + decisions → V1-1 clients and animals → V1-2 sheet
- [x] F SVG classification + cleaning (§9.2): active/external removals classed in the sanitiser walk, `clean_svg(bytes)` (clean / cleanable / rejected), cleaned bytes ≤ 2 MiB, fixpoint property test, hostile corpus, cairo + ImageMagick exports (owner editor exports pending)
- [x] G wasm facade (`PreviewBuilder`, `PreviewSheet`, `clean_svg`, free ops) + ts-rs types + index; core-wasm proofs (equine preview = bundle index + fingerprint, mismatches, replace without re-read, hostile corpus in fresh instances)
- [x] H docs (RUST.md §12, contract §6.7/§8.1/§9.2/§10/§17.4, CLAUDE.md, sheet-model rule), gates, fresh reviews, evidence, memory, commit + push. Reviews: verifier ECARTS(6) then ECARTS(3) (A6 owner exports, A12 covered by check:all, helper recorded); security PASS ×2, every MEDIUM fixed except owner decisions below. check:all green on 741c25c and 8294d54 (rerun on final). Open for owner: dangling #id across inlined drawings (scope ids per view or refuse), clean file uploaded as original bytes (§9.2), stricter-than-table refusals and the edit-command reading (§8.1, §9.2 « for the owner's confirmation »), cairo rgb() colours lost on cleaning, editor exports pending. Open for V1-2.3: M6 must accept a failed verdict without groups/drawings; R2 view.parent.cycle quadratic; PreviewSheet under CoreRuntime poison/recovery at V1-2.5
- [ ] I owner arbitrations (brief « V1-2.2 : arbitrages du propriétaire et finalisation », 2026-10-29, on 17d9199): READY FOR REVIEW kept; fixtures and isolated stacks only, DEV untouched; no merge; STOP at checkpoint, no V1-2.3
- [x] I1 SVG references: a dangling `#id` refused by the one reader (`dangling_reference`, cleaning classifies active content first); ids scoped per view in `view.canvas` (core composition, stored bytes and PDF views untouched); tests: valid, absent, same ids in two views, cross-view attempt, many references to one id, repeated composition
- [x] I2 serialisation, owner go 2026-10-29 (option « canonique + serveur »): every accepted file uploaded in one canonical form (`<?xml version="1.0" encoding="UTF-8"?>` + LF + core serialisation); verdict (`svg_not_canonical`, code `verification.integrity.svg_not_canonical`) and PreviewSheet refuse a stored drawing in another form; upload tool too; DEV equine object already canonical (sha256 0ea5202f… unchanged); contract §6.4, §6.5, §9.2, §9.3, §9.5; RUST.md §12
- [x] I3 cairo colours: strict numeric `rgb()` / `rgba()` kept in presentation attributes and `style`; `url(` outside the document, `expression(`, scripts, active CSS still refused; tests (colours kept, dangerous refused, fixpoint, shapes and references kept)
- [x] I4 edit commands, owner go 2026-10-29 (option « refus atomique »): `remove` refused `has_dependents` when any dependent is not a descendant (view: drawn annotations, child views, links opening it; annotation category; region; finding zone: linked annotations; reference: citing findings); finding descendants still go with their parent; contract §8.1 amended
- [x] I5 A6 inventory: Inkscape / Illustrator / Figma (version, drawing, steps, file name, folder, tests, status); Inkscape not installed → owner go 2026-10-29 to download it; inkscape.org answered 504 / timed out, so the Ubuntu archive package 1.4.3 (sha256 = signed index) + 22 libs fetched with `apt-get download`, unpacked in the scratchpad (no install, no sudo); 3 real exports + generator committed; Illustrator / Figma owner procedure; A6 stays open
- [x] I6 wasm size: contributors measured, optimisation options for later steps; cap and test kept; owner go 2026-10-29: `--remove-name-section` in scripts/wasm-build.sh (debug `name` section, 279 KB raw, −30 691 B gzip measured)
- [ ] I7 gates: rust:check, SVG security suites, property + mutation, wasm + ts-rs, size, check:all; fresh verifier + security; evidence, memory, commit + push
- [ ] V1-2.3 drawings and worker verification (M6) · V1-2.4 wireframes (editor, review, admin entry) · V1-2.5 catalogue, admin space, rights, species, MFA · V1-2.6 editor level 1 · V1-2.7 preview, review, publication UI · V1-2.8 equine working copy and review preparation · V1-2.9 FR/EN acceptance and closure (owner checkpoints V1-2.3, V1-2.4, V1-2.6, V1-2.7, V1-2.8, V1-2.9 + each DEV operation of contract §16.11)
## Release readiness track (owner 2026-10-25, distinct from the functional roadmap; nothing here authorises a release or exposure)