chore(memory): BDR-101, TODO and journal for V1-2.6 U0
This commit is contained in:
1 parent
d9e3e34aff
commit
452a346f17
3 files changed
+28
-4
No files matched your search
@@ -674,13 +674,14 @@ Order (BDR-071): P0 docs + decisions → V1-1 clients and animals → V1-2 sheet
|
||||
- [ ] V1-2.6 editor level 1: plan APPROVED by the owner 2026-11-03 (brief « GO propriétaire V1-2.6 »: 13 lots A-M, C1-C24, 8 visible choices, M8 sandbox only, no JSON export button, recovery messages exact), gated on a targeted independent re-check of the six FATAL fixes. Re-check 2026-11-03: REMAINING(2) — fixes 1-5 closed, I1-I5 hold; fix 6 (r = 12 + 3 %) opens `out_of_frame` on frames under ~25.5 units (hitbox r in frame bounds); I6 broken: the first commit overwrites a pending recovery copy before « Restaurer » / « Ignorer »; 2 MINOR (N source when the admin read fails, two-copy cap). Executor NOT launched; STOP for the owner. Owner arbitrations 2026-11-03 (« arbitrages propriétaire sur REMAINING(2) »): C25-C31 gated, plan revised; second targeted re-check: REMAINING(1), no BLOCKER, F1 MAJOR (accept trusted the core's silence on unmeasured views) + 7 MINOR, all integrated in the plan. Owner GO 2026-11-04 (« GO propriétaire après REMAINING(1) »): F1 fix approved, C26 refined by seven repair rules, minor effects approved; C32-C34 gated; execution of lots A-M authorised, no third plan review. 2026-11-04 13:08 the scratchpad worktree was removed by the harness cleanup (LRN-114): commits safe on origin (8343528), uncommitted lot H + lot G fix lost; worktree recreated at /home/bchanot/Documents/faunosteo-v1-2 (owner authorisation); resume ledger `.claude/tasks/plans/2026-11-03-v1-2-6-execution.md`. Contract `.claude/tasks/contracts/2026-11-03-v1-2-6-editor-1509.md`, plan `.claude/tasks/plans/2026-11-03-v1-2-6-editor.md`; sandbox only, no DEV, no worker on DEV, no merge, no V1-2.7; STOP at the V1-2.6 owner checkpoint (trial procedure)
|
||||
- [x] A M8 draft_last_save (2f824a9) · [x] B sheet asset accessors (f7e7bf4) · [x] C preview mutators, edit ops, ids (173be59..cfd49c7) · [x] D editor store, undo, recovery (7f1d440..b14509f) · [x] E route, modes, tabs (6aba971) · [x] F Général, Références, Vertèbres (d163b2c) · [x] G views + upload (8343528, 1bbf97e, 7ea9619) · [x] H Annotations (2609785, 3f15762) · [x] I Constats (92c595c, 91d06c9) · [x] J Vérification + submit (447d0a4..3d589e1) · [x] K e2e (5097fd7..4cc27a8) · [x] L owner trial tooling (ac5fbfb) · [x] M gates, reviews, checkpoint (071b58a..7a4ce9e; checkpoint report 2026-11-04, owner trial pending) · [x] N owner checkpoint decisions (C35-C44: be4f468..5e0aa62; ready for the owner trial, guide verified from the worktree) · [x] O last decisions (C45-C48: free paths never reshaped, explicit category zone, LAN trial on 192.168.1.100:5193; a69eba5..9b86f54) · [-] owner manual trial: STOPPED by the owner 2026-11-05 (T11, BDR-100), level 1 NOT declared validated as a whole
|
||||
- [ ] level-1 residuals kept in tracking (T11; re-checked at U8, `V1-2-6_UX_DECISIONS.md` T11): owner manual trial never run · real second device on the LAN not tested · editing specs at 375 px skipped (C16 waiver) + 8 admin journeys at 375 px skipped · worker-gated sandbox suite skipped (no worker by contract) · keyboard spec focuses programmatically (no Tab walk) · free-path attach repair covered by automated tests only · Safari iOS `beforeunload` unreliable · LOW security items of the checkpoint report « Audits and reviews » · review minors m4, m6, m7, m8, m10 · path point correction proposal (now in the curves lot)
|
||||
- [ ] V1-2.6 new editor UX maquettes (owner brief 2026-11-05 « nouvelles maquettes UX approuvées sur le principe »; contract `.claude/tasks/contracts/2026-11-05-v1-2-6-ux-maquettes.md`): mockups + feasibility audit only, no core/app code, no DEV, no merge, no V1-2.7; STOP at the graphic checkpoint
|
||||
- [x] core feasibility audit (`.claude/audits/2026-11-05-v1-2-6-ux-feasibility.md`) · [x] 16 boards + contact sheet + sources in `docs/design/v1-2-6/` · [x] REVUE.md (journey, 11 choices, contradictions, feasibility) · [x] fresh design review (6 MUST-FIX, 10 SHOULD applied; board 08 name finding wrong: frame holds Coude) + verifier ECARTS(2) U2/U9 fixed after (custom category menu, phone redraw), no re-verify · [x] commit + push branch · [x] owner review prep (brief 2026-11-05 « préparation de la validation propriétaire »): fresh verifier CONFORME 11/11 on 9f420d3 + 5 defects outside criteria kept (no redraw allowed), ARBITRAGES.md, ETUDE-TECHNIQUE.md, CONTROLE-CONFORMITE.md, archive `/home/bchanot/faunosteo-v1-2-6-ux-maquettes.zip` · [x] external ChatGPT review received (`faunosteo-v1-2-6-revue-ux-chatgpt.md`, untracked in the worktree root) · [ ] final corrections (brief 2026-11-05 « Revue finale des nouvelles maquettes UX V1-2.6 », contract `.claude/tasks/contracts/2026-11-05-v1-2-6-ux-corrections.md`): [x] board 04 trace strip · [x] undo/redo in the header on every tab · [x] board 07 split into distinct states, form visible · [x] counters computed from the data · [x] docs (confirmed vs open choices, prerequisites) · [x] targeted independent check: ECARTS(2) on 7bc3d65 (board 11 drawer hid header undo; 2 REVUE sentences) → fixed b5058b3, delta check K1-K8 8/8 MET, ECARTS(1) = K9 archive not built then · [x] archive `/home/bchanot/faunosteo-v1-2-6-ux-maquettes-2.zip` (SHA256SUMS verified on extraction by the author) · [ ] owner final graphic checkpoint
|
||||
- [x] V1-2.6 new editor UX maquettes (owner brief 2026-11-05 « nouvelles maquettes UX approuvées sur le principe »; contract `.claude/tasks/contracts/2026-11-05-v1-2-6-ux-maquettes.md`): mockups + feasibility audit only, no core/app code, no DEV, no merge, no V1-2.7; STOP at the graphic checkpoint
|
||||
- [x] core feasibility audit (`.claude/audits/2026-11-05-v1-2-6-ux-feasibility.md`) · [x] 16 boards + contact sheet + sources in `docs/design/v1-2-6/` · [x] REVUE.md (journey, 11 choices, contradictions, feasibility) · [x] fresh design review (6 MUST-FIX, 10 SHOULD applied; board 08 name finding wrong: frame holds Coude) + verifier ECARTS(2) U2/U9 fixed after (custom category menu, phone redraw), no re-verify · [x] commit + push branch · [x] owner review prep (brief 2026-11-05 « préparation de la validation propriétaire »): fresh verifier CONFORME 11/11 on 9f420d3 + 5 defects outside criteria kept (no redraw allowed), ARBITRAGES.md, ETUDE-TECHNIQUE.md, CONTROLE-CONFORMITE.md, archive `/home/bchanot/faunosteo-v1-2-6-ux-maquettes.zip` · [x] external ChatGPT review received (`faunosteo-v1-2-6-revue-ux-chatgpt.md`, untracked in the worktree root) · [x] final corrections (brief 2026-11-05 « Revue finale des nouvelles maquettes UX V1-2.6 », contract `.claude/tasks/contracts/2026-11-05-v1-2-6-ux-corrections.md`): [x] board 04 trace strip · [x] undo/redo in the header on every tab · [x] board 07 split into distinct states, form visible · [x] counters computed from the data · [x] docs (confirmed vs open choices, prerequisites) · [x] targeted independent check: ECARTS(2) on 7bc3d65 (board 11 drawer hid header undo; 2 REVUE sentences) → fixed b5058b3, delta check K1-K8 8/8 MET, ECARTS(1) = K9 archive not built then · [x] archive `/home/bchanot/faunosteo-v1-2-6-ux-maquettes-2.zip` (SHA256SUMS verified on extraction by the author) · [x] owner final graphic checkpoint: 16 boards + 11 choices validated 2026-11-05 (brief « Validation UX définitive et préparation technique », confirmed by the brief « Autorisation U0 uniquement »)
|
||||
- [ ] separate tracks kept apart: TOTP asked at sign-in; missing illustrations blocking the copy of the historical equine sheet; phone editing (full touch editing below 1 024 px) = distinct future lot after V1-2 (owner 2026-11-05, choice 9; boards 14-16 kept as its reference)
|
||||
- [ ] V1-2.6 UX redesign technical preparation (owner brief 2026-11-05 « V1-2.6 — Validation UX définitive et préparation technique »: 16 boards + 11 choices validated; docs and static audits only, no app/Rust/SQL/worker code, no DEV, no merge, no V1-2.7; STOP at the technical checkpoint)
|
||||
- [x] static audits (core model, rendering/PDF/N-1, geometry/wasm, SQL/worker, editor/tests) · [x] docs/development V1-2-6_UX_{PLAN,COMPATIBILITY,TESTS,RISKS,DECISIONS}.md (sub-steps U0-U9, decisions T1-T19) · [x] independent review (3 lenses: CONCERNS 5/9/6, no BLOCKER) + fixes integrated (plan §6) · [x] commit + push branch · [x] owner answers 2026-11-05 (brief « V1-2.6 UX — Ratification des décisions techniques », BDR-100): T11 approved, T16 conditional deferral (curves lot), T2/T3 conditional on proofs, T4 no residual gap, T5 history preserved, T9 three actions, T10 navigation type, T12 principle · [x] five docs updated (decisions, compatibility §0/§7/§8, tests, risks + blocking criteria, plan §7) · [x] LRN-118 (wasm measuring rule) · [x] independent reviews: correctness challenger CONCERNS(5 MAJOR, 7 MINOR) integrated; verifier ECARTS(2) fixed; targeted re-check ECARTS(2) (one U6 test assumed permissive save, deploy order said all rounds) fixed · [x] third independent check before commit (2026-11-05): ECARTS(2) on K10/K11 (R-3 mitigation, U6 objective on older T4 scope, write-lock test assumed stripping save, T16 count scope in two forms) fixed · [x] fresh targeted re-check: CONFORME 12/12 (G1-G4 closed; 7 observations kept for U0) · [x] commit + push · [ ] owner answers still needed: T4 declared SQL checks (publication, save non-regression; O22 amendment), T5 new-sheet defaults (ids, EN names, colours), T10 option B, T15 (before U1), T17 (before U6), T12 text (before U7); T1 only if a measure exceeds · [ ] owner authorisation to start U0 (no sub-step before it)
|
||||
- [x] static audits (core model, rendering/PDF/N-1, geometry/wasm, SQL/worker, editor/tests) · [x] docs/development V1-2-6_UX_{PLAN,COMPATIBILITY,TESTS,RISKS,DECISIONS}.md (sub-steps U0-U9, decisions T1-T19) · [x] independent review (3 lenses: CONCERNS 5/9/6, no BLOCKER) + fixes integrated (plan §6) · [x] commit + push branch · [x] owner answers 2026-11-05 (brief « V1-2.6 UX — Ratification des décisions techniques », BDR-100): T11 approved, T16 conditional deferral (curves lot), T2/T3 conditional on proofs, T4 no residual gap, T5 history preserved, T9 three actions, T10 navigation type, T12 principle · [x] five docs updated (decisions, compatibility §0/§7/§8, tests, risks + blocking criteria, plan §7) · [x] LRN-118 (wasm measuring rule) · [x] independent reviews: correctness challenger CONCERNS(5 MAJOR, 7 MINOR) integrated; verifier ECARTS(2) fixed; targeted re-check ECARTS(2) (one U6 test assumed permissive save, deploy order said all rounds) fixed · [x] third independent check before commit (2026-11-05): ECARTS(2) on K10/K11 (R-3 mitigation, U6 objective on older T4 scope, write-lock test assumed stripping save, T16 count scope in two forms) fixed · [x] fresh targeted re-check: CONFORME 12/12 (G1-G4 closed; 7 observations kept for U0) · [x] commit + push · [x] owner answers 2026-11-05 (brief « Autorisation U0 uniquement », BDR-101): T4 both SQL checks approved (O22 amended), T5 defaults, T10 option B, T15, T16 count before activation, « Remplacer par un polygone » explicit · [ ] still open: T17 (before U6), T12 text (before U7), T6 (V1-2.8), T14 follow-up; T1 only if a measure exceeds · [x] owner authorisation to start U0 (2026-11-05)
|
||||
- [ ] V1-2.6 UX U0, contract and decisions, docs only (contract `.claude/tasks/contracts/2026-11-05-v1-2-6-ux-u0.md`; no code, no SQL, no DEV, no U1): [x] V1-2 contract §6.2, §6.4, §6.7, §7.4, §8.2-§8.4, §12.2 + §17.1 (O22), §16.7, §16.12, §17.12 · [x] level-1 contract C3, C4, C5, C6, C7, C8, C11, C13, C16, C18, C20, C25, C28, C32, C33, C40, with the precedence rule of its header · [x] docs/design/README.md · [x] rules sheet-model.md, schemas.md · [x] five UX docs · [x] BDR-101 · [x] preconditions (r5:import-equine --check clean, seed 22/6/0 paths, wasm 592 143 B) · [x] independent verification: ECARTS x6 fixed, then CONFORME 12/12 (2026-11-06); open points for U2/U6 not in docs: point edge-size handle (boards 02/03), default laterality of the automatic access (U6), §15 replay text vs the category.fixed.* filter · [x] commit + push · [ ] owner U0 checkpoint (then U1 on a new authorisation)
|
||||
- [ ] follow-up candidates (owner T14): multi-tab notice; RR item for the rollback limit of the category model (new id, reconcile with develop)
|
||||
- [ ] curves lot (ex-U9, owner T16 2026-11-05): curve handle editing, curved zone move, path remap, path point correction; spec `V1-2-6_UX_PLAN.md` §2 D, tests `V1-2-6_UX_TESTS.md` « Curves lot ». Rule: no feature that lets a path enter a document (package import, zones from the drawing's shapes, a curve drawing tool) ships before or without it. Before U6 or U8 reaches any environment beyond the throwaway sandbox: read-only count of path geometries in its drafts and published versions (non-zero reopens T16)
|
||||
- [ ] curves lot (ex-U9, owner T16 2026-11-05): curve handle editing, curved zone move, path remap, path point correction; spec `V1-2-6_UX_PLAN.md` §2 D, tests `V1-2-6_UX_TESTS.md` « Curves lot ». Rule: no feature that lets a path enter a document (package import, zones from the drawing's shapes, a curve drawing tool) ships before or without it. Before the new model is activated on an environment, and before U6 or U8 reaches any environment beyond the throwaway sandbox: read-only count of path geometries in its drafts and published versions (sandbox by U6 itself; DEV and shared environments by the owner or under explicit authorisation; non-zero reopens T16)
|
||||
- [ ] MANDATORY before merging V1-2 into develop (owner 2026-11-03): registry id reconciliation. LRN-095 collides: develop 09655b2 « Port a safe runner verbatim… » (2026-11-02) vs V1-2 « pgTAP across PGlite and the real Supabase image… » (2026-10-28, cited by BDR-084 and the V1-2.1 TODO lines). BLK-013 exists on develop only (« e2e:avatar on develop reached DEV »): `memory.sh` on V1-2 would hand out BLK-013 again, so a V1-2 blocker needs its id checked against develop first. Same for the TODO release-readiness ids: RR-11 is develop's (« sandbox-only e2e follow-ups »), V1-2 uses RR-12. No renumbering during V1-2.6 unless needed; renumber one side and patch its citers at the merge
|
||||
- [ ] V1-2.5 catalogue, admin space, rights, species, MFA · V1-2.6 editor level 1 · V1-2.7 preview, review, publication UI · V1-2.8 equine working copy and review preparation · V1-2.9 FR/EN acceptance and closure (owner checkpoints V1-2.3, V1-2.4, V1-2.6, V1-2.7, V1-2.8, V1-2.9 + each DEV operation of contract §16.11)
|
||||
|
||||
|
||||
Reference in new issue
Block a user