chore(memory): BDR-082 V1-2 decisions ratified, TODO, journal

This commit is contained in:
bchanot committed 2026-10-28 11:35:52 +01:00
1 parent 7fec2ce86f
commit 41d3b09120
3 files changed
+18 -1

No files matched your search

+4 -1
View File
@@ -533,7 +533,10 @@ Order (BDR-071): P0 docs + decisions → V1-1 clients and animals → V1-2 sheet
- [ ] Code debt (not P0, no change on the doc branch): `docker/nginx.conf` still has `location /species/` (public/species deleted at Step 5); remove with its own `chore/` or `bugfix/` branch
- [ ] V1-2 anatomical sheets from Supabase + official sheet administration (owner briefs 2026-10-27 « V1-2 : cadrage » and « V1-2.0 : contrat fonctionnel et technique »; D1-D8 orientations approved, D9 admin requirement mandatory, BDR-081). Branch `feature/v1-2-anatomical-sheets` (off develop 9135d73, worktree outside the main tree while the recette server runs). Contract `docs/development/V1-2_ANATOMICAL_SHEETS.md` = the plan (steps §16, decisions §17). No implementation, migration, DEV write, seed or equine publication before the owner ratifies the contract; merge only on the owner's go
- [ ] V1-2.0 contract and decisions (docs only): read-only audit delivered; contract drafted; 3 fresh plan challengers (correctness, robustness, simplicity); doc fixes (V1-1 status in TODO + V1-1 contract header, CLAUDE.md M1-M3 line); challengers FATAL(2 blockers)/FATAL(1)/CONCERNS integrated (contract §19); STOP at checkpoint: owner ratification of §5-§16 and options O1-O20
- [ ] V1-2.1 server workflow (M4, M5) · V1-2.2 drawings and server verdict (M6, worker job) · V1-2.3 core preview, completeness, edit primitives · V1-2.4 wireframes (editor, review, admin entry) · V1-2.5 catalogue and admin space · V1-2.6 editor level 1 · V1-2.7 preview, review, publication UI · V1-2.8 equine review preparation · V1-2.9 FR/EN acceptance and closure (owner checkpoints after V1-2.2, V1-2.6, V1-2.7, V1-2.9)
- [x] owner review of O1-O20 delivered (2026-10-28, read-only); O21-O23 proposed (catalogue access, SQL mirror, failed verification)
- [x] owner ratified O1-O23 (brief « V1-2.0 : ratification des arbitrages O1 à O23 et consolidation du contrat », 2026-10-28, BDR-082)
- [ ] consolidation (docs only): contract rewritten (decisions §17, contradictions C1-C14 §19.2, steps §16 with 9 headings each); IMPLEMENTATION_PLAN §0 + Steps 13/17 notes, ANATOMICAL_SHEET_MODEL stale Zod/TS mentions + V1-2 pointer, OPEN_QUESTIONS conflicts 1-2, V1-1 §5.4 pointer (N1 amended), rule sheet-model, CLAUDE.md pointer; 3 fresh challengers (business CONCERNS 3 major, security FATAL 1 arbitration + 6 major, simplicity CONCERNS 5 major) integrated (contract §19.3); commit + push branch; STOP at checkpoint: owner final review + AR-1 (MFA on platform role grants, contract §17.2), no V1-2.1
- [ ] V1-2.1 server access and workflow (M4, M5) · V1-2.2 core verdict, preview, change list, edit primitives, SVG cleaning · V1-2.3 drawings and worker verification (M6) · V1-2.4 wireframes (editor, review, admin entry) · V1-2.5 catalogue, admin space, rights, species, MFA · V1-2.6 editor level 1 · V1-2.7 preview, review, publication UI · V1-2.8 equine working copy and review preparation · V1-2.9 FR/EN acceptance and closure (owner checkpoints V1-2.3, V1-2.4, V1-2.6, V1-2.7, V1-2.8, V1-2.9 + each DEV operation of contract §16.11)
## Release readiness track (owner 2026-10-25, distinct from the functional roadmap; nothing here authorises a release or exposure)
Inventory: `.claude/audits/2026-10-25-functional-inventory.md`. Each item: treat or qualify before any release or public exposure; not fixed now unless an active critical flaw is shown.