docs(docs): U2b F5, F9-F21 ratified with F3, F8, F11-F14, F22 precisions

Owner brief « Ratification finale U1 et autorisation conditionnelle
d'implémentation » (BDR-105): study §6 tests, §7 table, 7.2, 7.3,
UX plan U2b entry, REVUE and decisions pointer. No implementation.
This commit is contained in:
bchanot committed 2026-11-06 17:12:30 +01:00
1 parent 7defed1c55
commit 1ed5c96e1b
6 files changed
+98 -39

No files matched your search

+13
View File
@@ -852,3 +852,16 @@ Still open: F5, F9-F21 (recommendations only); U2b contract details: F3 œ/æ/
**Open**: see above. Recorded in `V1-2-6_UX_FINDINGS_NAV.md` §6-§7, `V1-2-6_UX_PLAN.md` U2b, `V1-2-6_UX_U1_CHECKPOINT.md`.
- **Status (2026-11-06)**: accepted, precision after fresh verifier: F2 « Identity = zone id + node path » is the study's reading (V1-2-6_UX_FINDINGS_NAV.md §7 F2), not owner wording; « never by label » comes from owner F8.
- **Status (2026-11-06)**: accepted, wording: « decided in full » means decided by the owner; details left to the U2b contract stay open (F3 œ/æ/’ fold and other-language display, F8 second confirmation).
## BDR-105 — V1-2.6 U1 final ratification + conditional authorisation; U2b F5, F9-F21 ratified (2026-11-06)
- **Status**: accepted 2026-11-06 by owner
Owner brief « V1-2.6 UX — Ratification finale U1 et autorisation conditionnelle d'implémentation », 2026-11-06. Owner decisions only.
U1: 18 visible choices (checkpoint page §1), approach A, amendments AC3/AC4/AC5/AC7/AC17, changes 2.6-2.9 approved. Plan 2e46c14 stays reference, not redesigned. Two precautions: (1) 2.8 forms unmounted: no silent loss of typed input on 1 024 px crossing or recovery decision; check real components; keep values when safe U1-scope solution exists, else explicit confirmation or precise documented limit with recovery guarantees; out-of-scope need → report block before that work; tests. (2) AC7 save time: check rights of existing endpoint, no permission widening; not readable with normal practitioner rights → « Enregistré · révision n »; never success before server confirmation, never browser clock. Pre-code: independent re-check of 3 unverified confirmation-pass fixes (commitFocusedField before moves, tracing kept on « Aller à », every editor-*.spec.ts per lot from B1) + both precautions; exact verdict; blocking gaps fixed and re-checked first. Then U1 lots A-I authorised, commit + push per lot, no next lot with unmet preconditions.
Sandbox: per-operation go only. Before each `db:sandbox down`, `up fresh` or equivalent: stop, read-only inventory (containers, non-seed accounts, sheets, drafts, resources), show exact deletion, wait explicit go. No carry-over of earlier go. DEV never substitute.
U2b (no implementation): F5, F9-F21 approved as recommended (a). Precisions: F3 shared normalisation catalogue + findings, œ/oe, æ/ae, straight/typographic apostrophes; match only in other language shows that label too. F8 same-name zone → reuse proposed; distinct zone after explicit confirmation; no name uniqueness. F11 first annotation in document order, others offered at once. F12/F14 accessible identification, not colour alone, visible names. F13 detail hidden while filtering, state kept. F22 zone preselected, change via « Changer la zone associée », no silent move. U2b after U2, before U3.
Alternatives not taken: plan redesign; global sandbox reset go; U2b now.
Status: in force. Supersedes nothing (completes BDR-104).