chore(memory): V1-2.4 G1/G2 corrections, verifier CONFORME, journal

This commit is contained in:
bchanot committed 2026-11-02 12:44:41 +01:00
1 parent 98e8403f8b
commit 1a68cd8351
2 files changed
+3 -1

No files matched your search

+1
View File
@@ -505,3 +505,4 @@ R5.4: `draft/{labels,changelog,review_report,drawing,overlay,app_review,svg_comp
## 2026-11-02
- 2026-11-02 V1-2.3 closed (BDR-093, risk register §13.1), e2e:sheet-assets sandbox alias, V1-2.4 maquettes proposal. TWO DEV READ INCIDENTS: old DEV sheet-assets script ran from main checkout at 23:03:49 (executor, backgrounded cd) and 23:10:59 UTC (orchestrator, unquoted heredoc backticks); 13 GET each, no write, DEV not restarted. Stopped, reported to owner.
- 2026-11-02 incident containment: bugfix sheet-assets guard merged into develop 6287e5b (always refuses there), refusals proven without IP sockets, security PASS; incident report reconciled (13 GET each); LRN-110 supersedes LRN-102. V1-2.4 maquettes: design review applied, security PASS on V1-2 runner, verifier ECARTS(1) (§13.1 register in the maquettes commit, owner-ordered). Graphic checkpoint.
- 2026-11-02 V1-2.4 G1/G2 fixed on owner brief: phantom warning board 06 removed, « Mark as reviewed » to arbitrate, fingerprint + verdict_refused messages match code; only 06/12 re-rendered, contact sheet + REVUE.md; fresh verifier CONFORME; 98e8403 pushed. Graphic checkpoint, no approval.
+2 -1
View File
@@ -801,4 +801,5 @@ Apply when implementing B-phase:
- [x] T containment (brief « Incident DEV : confinement, correctif urgent et reprise V1-2.4 », 2026-11-02): bugfix/sheet-assets-e2e-sandbox-only merged into develop 6287e5b (runner byte-identical to V1-2 bbc0627, always refuses on develop); refusals proven without IP sockets (strace, 7 configs), sandbox run 11 PASS; security PASS + 3 LOWs fixed; incident report `.claude/audits/2026-11-01-dev-read-incidents.md` (13 GET each, reconciled); LRN-110 supersedes LRN-102
- [ ] at the V1-2 merge: CLAUDE.md (e2e:sheet-assets line) and docs/development/SUPABASE.md §3.1 conflict with develop's bugfix text: keep the V1-2 text
- [ ] still vulnerable, owner decision needed: develop `pnpm e2e:avatar` (scripts/avatar-e2e.sh: DEV keys, worker on DEV, writes, purge expedite); main checkout (feature/v1-1-clients-animals) and worktree old-958228a hold both old scripts on disk; main and release/0.2.0 hold neither. Agents never run them.
- [ ] V1-2.4 maquettes: design review (4 MUST-FIX, 10 SHOULD) applied, boards re-rendered; sheet-assets V1-2 security PASS, LOWs open: one sandbox e2e at a time (shared gateway name and port), PGPASSWORD reaches the sheet-assets build, issuer claim not signature, gateway left after SIGKILL; verifier pending; graphic checkpoint
- [ ] V1-2.4 maquettes: design review (4 MUST-FIX, 10 SHOULD) applied, boards re-rendered; sheet-assets V1-2 security PASS, LOWs open: one sandbox e2e at a time (shared gateway name and port), PGPASSWORD reaches the sheet-assets build, issuer claim not signature, gateway left after SIGKILL; verifier ECARTS(2) on a15c35c (G1 phantom warning board 06, G2 « Mark as reviewed » shown ratified) → owner-authorised text fixes + fingerprint / verdict_refused messages, only 06 and 12 re-rendered, contact sheet + `docs/design/v1-2-4/REVUE.md` (98e8403); fresh verifier CONFORME; graphic checkpoint: owner visual validation of the 12 boards and 31 FR/EN labels pending
- [ ] owner to confirm which ten UX decisions the brief « corrections G1/G2 » calls ratified (read as checkpoint items 2-11; item 3, catalogue access O21, has no drawn option) before a BDR