chore(memory): functional inventory, roadmap proposal, release readiness track
ci / rust (push) Canceled after 0s
ci / check (push) Canceled after 0s
ci / docker (push) Canceled after 0s
ci / supabase (push) Canceled after 0s

This commit is contained in:
bchanot committed 2026-10-25 15:06:37 +01:00
1 parent d6306ff448
commit 0c54e4b3c3
3 files changed
+113

No files matched your search

+4
View File
@@ -384,3 +384,7 @@ R5.4: `draft/{labels,changelog,review_report,drawing,overlay,app_review,svg_comp
## 2026-10-25 (R5 merged)
- Owner authorised finish. Pre-checks: branch = origin, develop = origin/develop 9c0117a ancestor, post-gate delta .md only, census 18/18, no secret. `gitflow finish` → merge 9ba2a25 (parents 9c0117a, 505a837), tree = branch tip, feature branch removed local + origin.
- R0-R5 done on develop. Not production: npm advisories (zod 4 first), rollback v1, DEV hardening, cascade debt, SQL checks, export API trust, census LOW stay open. STOP at checkpoint.
## 2026-10-25 (product survey)
- Owner closed R0-R5, asked read-only functional survey + roadmap. 4 parallel analyzers. Inventory `.claude/audits/2026-10-25-functional-inventory.md`; release readiness track RR-1..RR-10 in TODO.
- Finding: local tool and /app not linked; no client/animal/report tables; plan text drifted (step numbers, Node worker, Step 13 "published"). Proposed V1-1 owners + animals first, needs C4/C5/C6. STOP, no branch, no code.