feat(agents): contract interview include + verifier agent (verify-loops lot 2)
lib/contract-interview.md: mandatory upstream passage for all orchestrators. Verbatim REQUEST (immutable), proportional questions (complete request = zero, max 3 one batch), testable criteria + file scope, written to disk immediately (.claude/tasks/contracts/<date>-<slug>-<HHMM>.md — a context-only contract dies at compaction). Lifecycle: enrichment only at human gates ([gated] marker, scope micro-gate), supersedes for re-scope, aborted runs deleted or committed status:aborted — never left dirty. Hand-off = path, not restatement. agents/verifier.md: fresh read-only verifier. Reads the contract from disk, renders VERIFY — VERDICT: CONFORME | ECARTS(n) | ERROR. Blind: never receives iteration history. PROOF line mandatory (LRN-048), UNVERIFIABLE never MET, mute verifier never a PASS (retry once fresh, 2nd structural failure = human escalation). Orchestrator protocol documented in-file (max 3 iterations, re-verify request before security). lib/tests/contract-verifier.test.sh: 31 deterministic structure locks on the load-bearing doctrine clauses — green, shellcheck clean. Behavioral dogfood (2 fresh subagents on a planted fixture): gap case → ECARTS(2) exactly as planted (NOT-MET located + out-of-scope flagged); conform case with injected fake iteration history → CONFORME, noise ignored, real python spot-check as evidence. Both outputs parse-clean. Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01XpphkdTosUzokBDNG7PToS
This commit is contained in:
co-authored by
Claude Opus 4.8
parent
ff13abfda5
commit
6aed5eea8c
@@ -0,0 +1,104 @@
|
||||
# Contract interview — mandatory upstream passage (all orchestrators)
|
||||
|
||||
Produces the CONTRACT: the single reference passed verbatim to the plan, the
|
||||
dev subagents, and the verifier. The contract is what lets the orchestrator
|
||||
delegate execution without subagents ever needing a human gate (LRN-083:
|
||||
subagents = execution + report only; gates and loop decisions live in the
|
||||
main loop).
|
||||
|
||||
Run this in the ORCHESTRATOR MAIN LOOP, never in a subagent — STEP 2 may
|
||||
talk to the human. Mandatory passage in every flow; questions are optional
|
||||
and proportional — a complete request goes through silently.
|
||||
|
||||
## STEP 1 — CAPTURE (verbatim)
|
||||
|
||||
Copy the user's request EXACTLY as typed (`$ARGUMENTS` + the triggering
|
||||
message). No paraphrase, no cleanup, no translation, no summarizing. This
|
||||
section is IMMUTABLE for the life of the run — every later consumer
|
||||
(planner, dev, verifier) reads THESE words, never a restatement.
|
||||
|
||||
## STEP 2 — AMBIGUITY CHECK (questions optional, proportional)
|
||||
|
||||
Ask ONLY if one of these is missing AND not derivable from the repo:
|
||||
- a testable expected outcome
|
||||
- an unambiguous scope (what is allowed to change)
|
||||
- non-contradictory constraints
|
||||
|
||||
Complete request → ZERO questions, stay silent. Otherwise: max 3 questions,
|
||||
one single batch (house rule: one question upfront, never mid-task). Never
|
||||
ask what the repo can answer — verify paths/APIs/behavior yourself first.
|
||||
|
||||
## STEP 3 — DERIVE
|
||||
|
||||
- ACCEPTANCE CRITERIA: numbered; each one testable — a fresh reader must be
|
||||
able to mark it MET / NOT-MET against the real code, without having seen
|
||||
this conversation.
|
||||
- FILE SCOPE: paths/zones expected to change, or `repo-wide — <reason>`.
|
||||
|
||||
## STEP 4 — WRITE TO DISK (immediately, before any next step)
|
||||
|
||||
Path: `.claude/tasks/contracts/<YYYY-MM-DD>-<slug>-<HHMM>.md`
|
||||
(`mkdir -p` the directory; unique per run: date + short kebab slug + HHMM —
|
||||
two runs on the same day never collide). A contract that lives only in
|
||||
context dies at compaction, and the verbatim request with it.
|
||||
|
||||
Template:
|
||||
|
||||
```markdown
|
||||
# CONTRACT — <slug>
|
||||
- date: <YYYY-MM-DD> | flow: <ship-feature|feat|bugfix|hotfix|init-project|onboard> | branch: <branch>
|
||||
- status: active
|
||||
|
||||
## REQUEST (verbatim — IMMUTABLE)
|
||||
<the user's exact words>
|
||||
|
||||
## CLARIFICATIONS
|
||||
Q: <question> / A: <answer>
|
||||
(or: none — request complete)
|
||||
|
||||
## ACCEPTANCE CRITERIA
|
||||
1. <testable criterion>
|
||||
2. <testable criterion>
|
||||
|
||||
## FILE SCOPE
|
||||
<paths/zones>
|
||||
(or: repo-wide — <reason>)
|
||||
```
|
||||
|
||||
Print one line to the user, then continue the flow:
|
||||
`CONTRACT: <path> — <n> criteria, scope <files|repo-wide>, <q> questions asked`
|
||||
|
||||
## Lifecycle
|
||||
|
||||
- **REQUEST**: immutable, for the life of the run. Never rewritten, never
|
||||
"cleaned up".
|
||||
- **CRITERIA / FILE SCOPE enrichment**: ONLY at a human gate, each added
|
||||
entry marked `[gated <YYYY-MM-DD>]`. A dev subagent NEVER enriches the
|
||||
contract. An out-of-scope edit the dev justifies is accepted ONLY through
|
||||
this micro-gate: human approves → FILE SCOPE gains the entry `[gated]`;
|
||||
human declines → the dev removes the edit. Without this gate the dev
|
||||
justifies everything and scope constrains nothing.
|
||||
- **Deep re-scope** (the request itself changes): NEW contract file with
|
||||
`supersedes: <old path>` in its header — never a rewrite of the old one.
|
||||
- **Aborted run**: delete the contract file, or commit it with
|
||||
`status: aborted` in the header. NEVER left dirty in the working tree.
|
||||
- **Commit**: the contract rides the existing memory commit —
|
||||
`lib/capitalize-commit.md` already covers the `.claude/tasks` pathspec.
|
||||
No new plumbing.
|
||||
|
||||
## Weight per flow
|
||||
|
||||
| Flow | Weight |
|
||||
|------|--------|
|
||||
| hotfix | Silent autofill — criteria: "symptom gone; build/tests green"; scope = the 1-2 target files. Zero questions ever. |
|
||||
| feat / bugfix | Proportional. bugfix: the DIAGNOSIS feeds the criteria (symptom reproduced-then-gone + regression test present). |
|
||||
| ship-feature | Full. Design decisions approved at the validation gate append criteria `[gated <date>]` — the human validates the enriched contract, the verifier receives that version. |
|
||||
| init-project | Full. The interviewer's PROJECT BRIEF pours into the contract (V1 features → criteria). |
|
||||
| onboard | Audit-scope contract (interview answers → what to audit, which axes). |
|
||||
|
||||
## Hand-off rule
|
||||
|
||||
Downstream consumers (plan step, dev subagents, verifier) receive the
|
||||
contract PATH, not a restatement of its content — the file on disk is the
|
||||
only authoritative copy, and reading it from disk is what makes the dev's
|
||||
reformulation structurally unable to interpose.
|
||||
Reference in New Issue
Block a user