feat(gates): wire GATE 0 into the four orchestrator skill restatements
The include is authoritative, but feat/bugfix/ship-feature/init-project each restate the verify loop inline — an orchestrator following the restatement alone would have skipped the floor. Each now carries the GATE 0 bullet ahead of GATE 1 (4 new structure locks, flip-tested). The contract-interview weight table stops promising a hotfix oracle nothing executes: hotfix runs no floor, the hotfixer runs the suite itself. CHANGELOG extended with the wiring + the RED result.
This commit is contained in:
@@ -27,6 +27,7 @@ tf "shf enrich at gate" "$SHF" "ENRICH the STEP 0e contract"
|
||||
tf "shf gated marker" "$SHF" "[gated <date>]"
|
||||
tf "shf verify+secure step" "$SHF" "STEP 5 — VERIFY + SECURE"
|
||||
tf "shf uses shared include" "$SHF" "lib/verify-secure-loop.md"
|
||||
tf "shf gate0 floor" "$SHF" "GATE 0 — deterministic floor"
|
||||
tf "shf judges enriched" "$SHF" "ENRICHED contract"
|
||||
tf "shf orthogonal to review" "$SHF" "DISTINCT axis from STEP 6 code review"
|
||||
|
||||
@@ -36,6 +37,7 @@ tf "ini criteria from V1" "$INI" "V1 FEATURES (each testable)"
|
||||
tf "ini enrich at gate1" "$INI" "ENRICH the STEP 1 contract"
|
||||
tf "ini verify+secure step" "$INI" "STEP 9 — VERIFY + SECURE"
|
||||
tf "ini uses shared include" "$INI" "lib/verify-secure-loop.md"
|
||||
tf "ini gate0 floor" "$INI" "GATE 0 — deterministic floor"
|
||||
tf "ini adds security gate" "$INI" "adds the security gate init-project previously lacked"
|
||||
|
||||
echo "-- onboard (explicit NO-LOOP audit) --"
|
||||
|
||||
Reference in New Issue
Block a user